My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-24-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:21:32 AM
Creation date
9/8/2020 4:35:25 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT `B" <br /> TO <br /> AMENDMENT TO DEVELOPMENT CONTRACT <br /> AND PLANNED UNIT DEVELOPMENT AGREEMENT <br /> Conditions of Approval <br /> 1. Realignment of the west parking lot entrance to align with the west school site entrance on the <br /> south side of Lake Valentine Road (Pick-up / Drop-off Access) to be completed prior to the start <br /> of the 2021-2022 school year. The School District will need to negotiate in good faith to complete <br /> easement or property acquisition from the adjacent parcel owned by State of Minnesota to <br /> accommodate the realignment of the west parking lot entrance. In the event an agreement is not <br /> reached the School District shall construct the proposed access on existing school property. <br /> 2. Elimination of eastbound left turn movements at the east parking lot access upon completing the <br /> realignment of the west parking lot entrance noted above. <br /> 3. Installation of perimeter fencing along the southwest portion of the parking lot upon completing <br /> the relocation of the west parking lot entrance noted above. Proposed fencing shall be four(4) tall <br /> decorative fencing. <br /> 4. Installation of a centralized traffic signal controlled pedestrian crossing at the location generally <br /> depicted on Figure 8 in the study report. <br /> 5. Installation of a small raised median and pedestrian refuge adjacent to the signal controlled <br /> pedestrian crossing as determined by the City Engineer during design of the signal. <br /> 6. Installation of sidewalk on the south side of Lake Valentine Road to route pedestrians from the <br /> signal controlled pedestrian crossing to the front entrance of the school building. <br /> 7. Installation of an additional street light at the signal controlled pedestrian crossing, in addition to <br /> the street lights previously installed at the east and west parking lot entrances. <br /> 8. Installation of School Zone Speed Limit signage as previously authorized by the City Council. <br /> 9. Installation of a 150-ft long exclusive right turn lane for eastbound Lake Valentine Road at the <br /> pick-up/ drop-off access (south side of street). <br /> 10. Installation of a 150-ft long exclusive right turn lane for westbound Lake Valentine Road at the <br /> east parking lot access (north side of street). <br /> 11. Installation of sidewalk along the north side of Lake Valentine Road between the east parking lot <br /> entrance and Janet Court. <br /> 8 <br /> 211093v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.