Laserfiche WebLink
EXHIBIT `B" <br /> TO <br /> AMENDMENT TO DEVELOPMENT CONTRACT <br /> AND PLANNED UNIT DEVELOPMENT AGREEMENT <br /> Conditions of Approval <br /> 1. Realignment of the west parking lot entrance to align with the west school site entrance on the <br /> south side of Lake Valentine Road (Pick-up / Drop-off Access) to be completed prior to the start <br /> of the 2021-2022 school year. The School District will need to negotiate in good faith to complete <br /> easement or property acquisition from the adjacent parcel owned by State of Minnesota to <br /> accommodate the realignment of the west parking lot entrance. In the event an agreement is not <br /> reached the School District shall construct the proposed access on existing school property. <br /> 2. Elimination of eastbound left turn movements at the east parking lot access upon completing the <br /> realignment of the west parking lot entrance noted above. <br /> 3. Installation of perimeter fencing along the southwest portion of the parking lot upon completing <br /> the relocation of the west parking lot entrance noted above. Proposed fencing shall be four(4) tall <br /> decorative fencing. <br /> 4. Installation of a centralized traffic signal controlled pedestrian crossing at the location generally <br /> depicted on Figure 8 in the study report. <br /> 5. Installation of a small raised median and pedestrian refuge adjacent to the signal controlled <br /> pedestrian crossing as determined by the City Engineer during design of the signal. <br /> 6. Installation of sidewalk on the south side of Lake Valentine Road to route pedestrians from the <br /> signal controlled pedestrian crossing to the front entrance of the school building. <br /> 7. Installation of an additional street light at the signal controlled pedestrian crossing, in addition to <br /> the street lights previously installed at the east and west parking lot entrances. <br /> 8. Installation of School Zone Speed Limit signage as previously authorized by the City Council. <br /> 9. Installation of a 150-ft long exclusive right turn lane for eastbound Lake Valentine Road at the <br /> pick-up/ drop-off access (south side of street). <br /> 10. Installation of a 150-ft long exclusive right turn lane for westbound Lake Valentine Road at the <br /> east parking lot access (north side of street). <br /> 11. Installation of sidewalk along the north side of Lake Valentine Road between the east parking lot <br /> entrance and Janet Court. <br /> 8 <br /> 211093v2 <br />