My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-24-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:21:32 AM
Creation date
9/8/2020 4:35:25 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Installation of a 2-inch mill and overlay along Lake Valentine Road between the construction <br /> limits of right turn lane construction (#9 and #10 above) to repair the existing pavement as a result <br /> of improvements noted above and utility crossings associated with the site improvements, as well <br /> as accommodating new pavement and crosswalk markings. <br /> 13. Signage identifying no student drop-off or pickup shall be added where necessary. <br /> 14. Permanent roadway markings shall be added to delineate the turn lanes at the western school <br /> entrance. <br /> 9 <br /> 211093v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.