Laserfiche WebLink
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST <br /> LAKE VALENTINE RD IMPROVEMENTS <br /> 8/6/2020 <br /> T42.121665 <br /> TOTAL ESTIMATED LAKE VALENTINE RD <br /> ITEM NO. ITEM DESCRIPTION UNIT UNIT COST TOTAL ESTIMATED COST <br /> QUANTITY ROADWAY <br /> QUANTITY COST <br /> ROADWAY AND SIDEWALK CONSTRUCTION <br /> 2011.601 AS BUILT LUMP SUM $150.00 1 $150.00 1 $150.00 <br /> 2021.501 MOBILIZATION LUMP SUM $7,000.00 1 $7,000.00 1 $7,000.00 <br /> 2101.524 CLEARING TREE $300.00 2 $600.00 2 $600.00 <br /> 2101.524 GRUBBING TREE $300.00 2 $600.00 2 $600.00 <br /> 2102.503 PAVEMENT MARKING REMOVAL LIN FT $0.85 500 $425.00 500 $425.00 <br /> 2102.518 PAVEMENT MARKING REMOVAL SO FT $6.75 96 $648.00 96 $648.00 <br /> 2104.503 SAWING CONCRETE PAVEMENT(FU LL DEPTH) LIN FT $5.00 16 $80.00 16 $80.00 <br /> 2104.503 REMOVE CURBAND GUTTER LIN FT $4.75 45 $213.75 45 $213.75 <br /> 2104.603 REMOVE AND REPLACE BITUMINOUS PAVEMENT LIN FT $30.00 45 $1,350.00 45 $1,350.00 <br /> 2105.601 SITE GRADING LUMP SUM $5,000.00 1 $5,000.00 1 $5,000.00 <br /> 2211.507 AGGREGATE BASE(CV)CLASS 5 CU YD $30.00 24 $720.00 24 $720.00 <br /> 2402.503 PIPE RAILING LIN FT $250.00 40 $10,000.00 40 $10,000.00 <br /> 2521.518 6"CONCRETE WALK SO FT $7.00 1059 $7,413.00 1059 $7,413.00 <br /> 2531.503 CONCRETE CURBAND GUTTER DESIGN B618 LIN FT $26.00 36 $936.00 36 $936.00 <br /> 2531.603 CONCRETE CURB DESIGN V LIN FT $65.00 59 $3,835.00 59 $3,835.00 <br /> 2531.618 TRUNCATED DOMES SO FT $55.35 38 $2,103.30 38 $2,103.30 <br /> 2563.601 TRAFFIC CONTROL LUMP SUM $7,500.00 1 $7,500.00 1 $7,500.00 <br /> 2564.518 SIGN PANELS TYPE C SO FT $60.00 18 $1,080.00 18 $1,080.00 <br /> 2565.501 EMERGENCY VEHICLE PREEMPTION SYSTEM LUMP SUM $3,161.00 1 $3,161.00 1 $3,161.00 <br /> 2565.516 TRAFFIC CONTROL SIGNAL SYSTEM SYSTEM $92,751.00 1 $92,751.00 1 $92,751.00 <br /> 2580.503 INTERIM PAVEMENT MARKING LIN FT $0.26 60 $15.60 60 $15.60 <br /> 2582.503 4"SOLID LINE PAINT LIN FT $0.10 280 $28.00 280 $28.00 <br /> 2582.503 12"SOLID LINE PAINT LIN FT $2.00 35 $70.00 35 $70.00 <br /> 2582.503 24"SOLID LINE PAINT LIN FT $3.20 30 $96.00 30 $96.00 <br /> 2582.503 4"BROKEN LINE PAINT LIN FT $0.15 40 $6.00 40 $6.00 <br /> 2582.503 4"DOUBLE SOLID LINE PAINT LIN FT $0.41 380 $155.80 380 $155.80 <br /> 2582.518 PAVEMENT MESSAGE PAINT SO FT $5.40 31 $167.40 31 $167.40 <br /> 2582.518 CROSSWALK PREFORM TAPE GROUND IN SQ FT $13.00 210 $2,730.00 210 $2,730.00 <br /> CONSTRUCTION TOTAL $152,404.85 $152,404.85 <br />