Laserfiche WebLink
Signal Quantities and Cost Estimate Summary <br /> Traffic Signal Pay Items <br /> Lake Valentine Road at Mounds View High School Ped Signal <br /> SP XXXX-XX SAP XXX-XXX-XXX <br /> Units Qty Est. Cost <br /> As Builts Lump Sum 1 $150 <br /> Mobilization (if a stand alone project) Lump Sum 1 $5,538 <br /> Traffic Control Signal System A Sig Sys 1 $55,378 <br /> Emergency Vehicle Preemption System Lump Sum 1 $3,161 <br /> Pay Items Total $64,077 <br /> LS <br /> Dept.Furnished Cabinet/Controller Type R(TS2) Each 1 $28,835 <br /> Controller(only) (AS3) Each 1 $3,000 <br /> Department Furnished' $31,835 <br /> Project Total $95,912 <br /> AS BUILTS NOTE:As-Builts Lump Sum= Total of all GPS Shots <br /> @$15 each. <br /> Units Qt Cost /Unit <br /> Y f" 4- <br /> Total Number of Handholcs Each 3 $15.00 $45.00 <br /> Total Number of Polcs &Pedestals Each 2 $15.00 $30.00 <br /> Total Number of Loop Detectors Each 0 $15.00 $0.00 <br /> Total Number of Push Button Stations Each 0 $15.00 $0.00 <br /> Cabinet/Equipment Pad Each 1 $15.00 $15.00 <br /> Total Length of all Conduit Lin Ft 211 <br /> GPS Shots on all Conduit Lin Ft/50 Each 4 $15.00 $60.00 <br /> Total Number of GPS Shots aJ S15 each Each 10 $15.00 $150.00 <br /> Pay Item Total $150.00 <br /> "Nonpublic data until project award" <br /> Signal Estimate_HAWK.xlsx <br /> Pay Item Summary 1 7/30/2020 <br />