Laserfiche WebLink
Item Units Qty Cost /Unit Est. Cost <br /> Fiber Optic SpliceVault Each $3,675.00 $0.00 <br /> Fiber Optic Cable Testing Lum Sum $9,375.00 $0.00 <br /> Fiber Optic Cable Splicing Each $1,700.00 $0.00 <br /> Outdoor Fiber Splice Enclosure Each $1,265.00 $0.00 <br /> Install Video Camera&Mount Each $300.00 $0.00 <br /> X6-350/CAM 400 Luminaire/Camera Extension Each $2,500.00 $0.00 <br /> X-400 Camera Extension Each $1,595.00 $0.00 <br /> Remove Signal Pole and All Pole Mounted Components Each $700.00 $0.00 <br /> Remove Signal Head Each $100.00 $0.00 <br /> Remove Light Pole&Foundation Each $500.00 $0.00 <br /> Remove Disconnect on S.O.P.Pole and F&I New Each $400.00 $0.00 <br /> Remove Cables Lin Ft $0.75 $0.00 <br /> Remove Signal System ($3000-$5,000) Each $3,000.00 $0.00 <br /> Remove Handhole Each $400.00 $0.00 <br /> Remove Mast Arm Pole Foundation Each $1,000.00 $0.00 <br /> Remove Pedestal Pole Foundation Each $400.00 $0.00 <br /> Salvage to C.E.S.U. Controller and Cabinet Each $180.00 $0.00 <br /> Salvage Microwave Detector to C.E.S.U. Each $25.00 $0.00 <br /> Salvage Signal System ($3000-$5,000) Each $0.00 $0.00 <br /> Salvage and Install Signal Head Each $200.00 $0.00 <br /> Salvage and Install Pedestrian Head Each $200.00 $0.00 <br /> Salvage and Install Luminaire Each $150.00 $0.00 <br /> Salvage&Install Signal Pole Extension with Luminaire Arm Each $250.00 $0.00 <br /> and Video Camera(CCTV) (includes plumbing the pole) <br /> Haul Salvage Material ($500-$1,000 per signal) Each $0.00 $0.00 <br /> Ground Rod Electrodes 5/8" x 15' (includes weld) Each $200.00 $0.00 <br /> Install Traffic Signal Cabinet&Controller (statefurnished) Each $1,000.00 $0.00 <br /> Clean out Conduits Lin Ft $1.00 $0.00 <br /> Thread Plug Each $75.00 $0.00 <br /> Pole End Cap Each $200.00 $0.00 <br /> Painting (paidfor agency requestingpaintinp) Lin Ft $15.75 $0.00 <br /> Core Drill inplace Concrete Equipment Pad Each $500.00 $0.00 <br /> Blue Enforcement Light(paidfor by agency requesting installation) Each $100.00 $0.00 <br /> Add Other Items Here: <br /> Pay Item Total $55,377.99 <br /> �FFIC CONTROL <br /> r stand alone projects only) <br /> Traffic Control ($3,000-$5,000 per signal replacement) Lump Sum $0.00 $0.00 <br /> (this is for stand alone projects only) <br /> Traffic Control-Lane Closure (per lane/per day) Day $300.00 $0.00 <br /> Signal Estimate_HAWK.xlsx <br /> Traffic Control Signal System 9 7/30/2020 <br />