Laserfiche WebLink
Units Qty Cost /Unit Est. Cost <br /> (this is for stand alone projects only) <br /> Mobilization lO% (6%of Contract Cost or 10%for Small Contracts) Lump Sum $5,537.80 <br /> (this is for stand alone projects only) <br /> DEPARTMENT FURNISHED MATERIALS <br /> (these will be paid in the signal agreement and are not part of <br /> the signal pay item). Can also be paid for with project funds <br /> ILF&I by Mn/DOT. <br /> Cabinet/Controller Type R(TS2)** (wfberatsignal) MOST COMMON Each $31,000.00 $0.00 <br /> Cabinet/Controller Type R(TS2)** (nofiber,no camera at signal) Each 1 $28,400.00 $28,400.00 <br /> Cabinet Shcll Each 1 $435.00 $435.00 <br /> Controller(only)(AS3) Each 1 $3,000.00 $3,000.00 <br /> Master Controller Each $4,925.00 $0.00 <br /> Microwave and/or Sonic Detector Unit Each $700.00 $0.00 <br /> Video Detection Camera&Associated Equipment ** Each $6,415.00 $0.00 <br /> PTZ Camera(CCTV W/mount,power supply and patch cables) Each $4,500.00 $0.00 <br /> abinet*** <br /> Camera Power Supply(CCTV) Each $130.00 $0.00 <br /> Power Cords and Patch Cablcs (F&1 =MniDOT) Lump Sum $40.00 $0.00 <br /> Malfunction Management Unit(MMU) (F&I=Mn/DOT) Each $1,200.00 $0.00 <br /> Ethernet Switch (F&I=Mn1DOT) Each $1,300.00 $0.00 <br /> SFPModulc (F&I=Mn/DOT) Each $300.00 $0.00 <br /> 12 Space Fiber Optic Patch Panel (F&1=MniDOT) Each $0.00 $0.00 <br /> ** (no charge if provided for a temporary signal) <br /> Add Other Items Here Each $0.00 $0.00 <br /> Project Total $92,750.78 <br /> "Nonpublic data until project award" <br /> Signal Estimate_HAWK.xlsx <br /> Traffic Control Signal System 10 7/30/2020 <br />