Laserfiche WebLink
____________________________________________________________________________________________ <br />City of Arden Hills <br />Planning Commission Meeting for September 9, 2020 <br />P:\Planning\Planning Cases\2020\20-010 4200 Round Lake Road PP/FP/CUP/PUD\PC Packets <br />Page 10 of 13 <br />In addition, the GB district requires the exterior materials be a mixture of brick, stone, glass or any <br />combination thereof, except trim and accessories may be metal. The Applicant is requesting <br />flexibility in exterior building materials is requested to better complement the surrounding <br />architecture found on Round Lake Road and Gateway Boulevard. The Applicant is requesting to <br />utilize a combination of painted pre-cast, glass, architectural metal panels with concealed fasteners, <br />and thin brick veneer. <br />L. Traffic Study <br />A traffic study was required and was completed by Kimley-Horn and Associates. The anticipated <br />trip generation during AM peak is 80 vehicles in and out of the site. The 80 vehicles includes eight <br />(8) warehouse related vehicles and 72 passenger vehicles. The PM peak is 83 vehicles in and out <br />of the site. The 80 vehicles includes eight (8) warehouse related vehicles and 75 passenger <br />vehicles. The proposed trip generation is fairly low based on the proposed use of 85 percent <br />warehouse and 15 percent office space. The traffic study only had one recommended <br />improvement. The recommendation requests Ramsey County to add five (5) seconds to the signal <br />timing for Round Lake Road and Hwy 96 to allow for more northbound left turns during the PM <br />peak hour. <br />Suggested Findings of Fact <br />Staff offers the following findings of fact for consideration: <br />1. The Applicant has submitted an application for a Planned Unit Development, Conditional Use <br />Permit and Preliminary/Final Plat at the Subject Property 4200 Round Lake Road. <br />2. The Applicant is proposing a 250,000 square foot office and warehouse facility on the Subject <br />Property. <br />3. The Applicant has submitted a preliminary and final plat to plat two (2) properties. <br />4. Flexibility through the PUD process has been requested in the following areas: district <br />provisions, lot area, lot dimensions, parking setbacks, building height, minimum caliper <br />inches, aesthetics, perennials and shrubberies. <br />5. The proposed development plan meets or exceeds the minimum requirements of the City Code <br />in the following areas: building setbacks, landscape coverage, parking, planting islands, street <br />trees, tree selection, floor area ratio, drainage wetlands and flood plain tree selection, lighting, <br />screening. <br />6. Where the plan is not in conformance with the City Code, flexibility has been requested by the <br />Applicant and/or conditions have been placed on an approval that would mitigate the <br />nonconformity. <br />7. A traffic study has been completed for the proposed use and suggests that Ramsey County to <br />add five (5) seconds to the signal timing for Round Lake Road and Hwy 96 to allow for more <br />northbound left turns during the PM peak hour. <br />8. Existing public facilities and shall be able to absorb the additional demand for public services <br />needed for the proposed use. <br />9. The Subject Property is located with the Gateway Business (“GB”) District and is guided as <br />Light Industrial & Office on the 2040 Land Use Plan. <br />10. The proposed Preliminary Plat and Final Plat are consistent with the Arden Hills Zoning Map <br />and the 2040 Comprehensive Plan. <br />11. The application is not anticipated to create a negative impact on the immediate area or the <br />community as a whole.