Laserfiche WebLink
____________________________________________________________________________________________ <br />City of Arden Hills <br />Planning Commission Meeting for September 9, 2020 <br />P:\Planning\Planning Cases\2020\20-010 4200 Round Lake Road PP/FP/CUP/PUD\PC Packets <br />Page 12 of 13 <br />In addition, any lighting under canopies (building entries) shall be recessed and use a <br />flush lens. <br />14. A right of way permit shall be required for work performed within the City right of <br />way. <br />15. A grading as-built and utility as-built plan shall be provided to the City upon <br />completion of grading and utility work. <br />16. No exterior storage shall be permitted. <br />17. This approval does not include signs. A separate sign permit is required for all proposed <br />signage. All signage shall meet the requirements of Sign District 6. <br />18. Prior to the issuance of a building permit, a landscape financial security of $50,000.00 <br />dollars shall be submitted. Landscape financial security is held for two full growing <br />seasons. <br />19. All rooftop or ground mounted mechanical equipment shall be hidden from view with <br />the same materials used on the building in accordance with City Code requirements. <br />20. All fencing and retaining wall materials shall be complementary to the building <br />materials and shall be approved in writing by the Planning Division prior to issuance <br />of a building permit. Retaining walls greater than four (4) feet in height shall be <br />engineered and detailed calculations shall be submitted to the City. <br />21. Prior to City Council consideration, the Applicant shall submit a materials board to be <br />approved in writing by staff. <br />22. A Grading and Erosion permit shall be obtained from the City’s Engineering <br />Department prior to commencing any grading, land disturbance or utility activities. The <br />Developer shall be responsible for obtaining any permits necessary from other <br />agencies, including but not limited to, MPCA, Rice Creek Watershed District, and <br />Ramsey County, MNDOT prior to the start of any site activities. <br />23. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and <br />all stormwater runoff, sediments and debris during all construction activities. <br />Temporary stormwater facilities shall be installed to protect the quality aspect of the <br />proposed and existing stormwater facilities prior to and during construction activities. <br />Maintenance of any and all temporary stormwater facilities shall be the responsibility <br />of the Applicant. <br />24. Prior to the issuance of the Grading and Erosion permit, the Engineering Department <br />shall review and approve final grading and utility plans in writing. Plans shall be <br />amended to include detail drawings for connection to the sanitary sewer system in <br />Gateway Boulevard, restoration of utility cuts within public streets, and inclusion of <br />City details 3401, 3402, 3408, and 4000. <br />25. Any future trash enclosures shall utilize wooden gates and be constructed on three sides <br />using the same materials and patterns used on the building. Locations shall be approved <br />by the Planning Department. <br />26. The Applicant shall provide an executed copy of the City’s standard stormwater <br />maintenance and easement agreement prior to approval of the Development <br />Agreement. <br />27. All disturbed boulevards shall be restored with sod. <br />28. All areas of the site, where practical, shall be sodded or seeded and maintained. The <br />property owner shall mow and maintain all site boulevards to the curb line of the public <br />streets.