My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-14-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:13:53 AM
Creation date
9/11/2020 1:09:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.7 Permits/Approvals <br /> The anticipated permits required for the proposed project are as follows: <br /> ■ Minnesota Department of Health . . . . . . . . . . . . . . . Extension of Water Main <br /> ■ Ramsey County . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Right-of-Way Permit <br /> ■ Rich Creek Watershed District . . . . . . . . . . . . . . . . . Rule C Erosion Control, Linear Rule D <br /> ■ Minnesota Pollution Control Agency . . . . . . . . . . . . Erosion and Stormwater Permit <br /> 3.8 Construction Access and Staging <br /> A traffic control and construction staging plan would be development during preparation of <br /> construction plans to coordinate property access and traffic safety within the project area. <br /> The contractor will be responsible for providing access to all properties at the end of each <br /> work day, with the exception of concrete curing times during curb installation. Additional <br /> information regarding staging and property access would be provided to residents prior to <br /> and during the construction phase of the project. <br /> Feasibility Report Page 9 <br /> 2021 PAP Street and Utility Improvements <br /> City Project Number PW 21-0100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.