My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-14-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:13:53 AM
Creation date
9/11/2020 1:09:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. ESTIMATED COST AND FUNDING <br /> 5.1 Opinion of Cost <br /> The opinion of probable cost for the project is provided in Table 4 and Table 5 below. <br /> Alternative 1 includes full curb and gutter construction and Alternative 2 includes limited <br /> curb and gutter construction as described in Section 3 of this report. The estimates includes <br /> 37% in overhead costs for street improvements and 30% overhead costs for utility <br /> improvements. Overhead costs account for engineering, legal, financing, contingency and <br /> administrative costs associated with the project. A detailed and itemized estimate is provided <br /> in Appendix G. <br /> Table 4- Summary of Project Costs <br /> Area 1 - Hazelnut Park Neighborhood <br /> Alternative 1 Alternative 2 <br /> Reclamation Reconstruction Reconstruction <br /> Improvement Area Costs Area Cost Area Cost <br /> Street Improvements-East Jerrold and Glen aul - $1,297,157 $1,156,525 <br /> Street Improvements-West Jerrold and Edgewater $346,170 - - <br /> Street Improvements-Prior Avene - $369,296 $369,296 <br /> Sanitary Sewer Improvements $18,675 $518,100 $518,100 <br /> Water Main Improvements - $679,959 $679,959 <br /> Storm Sewer Drainage Improvements - $577,162 $418,430 <br /> Total Estimated Cost by Area $364,845 $3,441,674 $3,142,310 <br /> GRAND TOTAL $3,806,519 $3,507,155 <br /> Table 5- Summary of Project Costs <br /> Area 2- Lake Valentine Road <br /> Estimated <br /> Improvement Costs <br /> Street Improvements-Lake Valentine Road $454,991 <br /> Sanitary Sewer Improvements $99,203 <br /> Total Estimated Cost 1 $554,194 <br /> The opinion of cost is based on recent construction projects of similar character and assumes <br /> the construction of proposed improvements will begin in 2021. Actual costs will be <br /> determined through competitive bids following final design for the project. <br /> Feasibility Report Page 11 <br /> 2021 PAP Street and Utility Improvements <br /> City Project Number PW 21-0100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.