My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-23-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
11-23-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2020 5:10:32 PM
Creation date
11/19/2020 5:09:17 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5 <br />211828v2 <br /> Plan I – Storm Water Pollution Prevention Plan (C6.1 and C6.2), dated 03/18/2020 <br />Plan J – Landscape Plan (C7), dated 05/01/2020 <br />Plan K – Tree Inventory and Preservation Plan, dated 05/07/2020 <br />Plan L – Final Plat, dated 09/09/2020 <br /> <br /> 6. IMPROVEMENTS. The Developer shall install and pay for the following private <br />improvements in accordance with the approved Plans: <br /> A. Sanitary Sewer System <br /> B. Water System <br /> C. Storm Sewer System <br /> D. Driveways, Parking Areas and connections to Streets <br /> E. Site Grading, Stormwater Filtration System and Erosion Control <br /> F. Landscaping and Tree Preservation <br /> G. Underground Utilities <br /> H. Setting of Iron Monuments <br /> I. Surveying and Staking <br />The improvements shall be installed in accordance with the City subdivision ordinance; and any other <br />ordinances of the City Code concerning erosion and drainage. Hours of construction, including moving <br />of equipment and delivery, shall be limited to the hours of 7:00 a.m. to 9:00 p.m. on weekdays and 8:00 <br />a.m. to 9:00 p.m. on any weekend or holiday. The Developer shall submit plans and specifications for <br />permit which have been prepared by a competent registered professional engineer to the City for <br />approval by the City Engineer which approval shall be provided on the condition that such submittals <br />comply with the Plans and this Agreement. The Developer shall instruct its engineer to provide adequate <br />field inspection personnel to assure an acceptable level of quality control. In addition, the City may, at <br />the City's discretion and at the Developer's expense, have one or more City inspectors and a soil engineer <br />inspect the work as the City may reasonably determine. The Developer, its contractors and <br />subcontractors, shall follow all instructions received from the City's inspectors. The Developer's engineer <br />shall provide for on-site project management. The Developer's engineer is responsible for design <br />changes and contract administration between the Developer and the Developer's contractor. The <br />Developer or his engineer shall schedule a pre-construction meeting at a mutually agreeable time at City <br />Hall with all parties concerned, including the City staff, to review the program for the construction work. <br /> 7. IRON MONUMENTS. In accordance with Minnesota Statutes Section 505.021 and the <br />Arden Hills City Code, the final placement of iron monuments for all lot corners must be completed
The URL can be used to link to this page
Your browser does not support the video tag.