Laserfiche WebLink
Private Utility Relocation 0% Traffic Signals 100% of County Legs Traffic Signal construction is addressed in a separate policy (County Board Resolution 81-1001). Electrical power shall be paid by the municipality. ITEM: COUNTY SHARE: NOTES: Roundabouts 100% of County Legs Retaining Walls50% 50% when retaining walls are constructed in lieu of right of way acquisition or to mitigate impacts; by negotiation when necessitated by design parameters. Grading Outside of Curb 100% 100% of area required for road construction. 50% of grading required specifically for sidewalks, trails, or other amenities. Medians 100% 100% of a standard concrete median design, including curb and gutter; municipalities shall pay for the additional cost of any decorative or aesthetic treatments. Sidewalks (new)50% Includes grading, aggregate base, surfacing, and pedestrian ramps.