|
SRF Consulting Group City of Arden Hills | Mounds View High School Trail Improvements 6
<br />STEVEN PRUSAK, PE | DESIGN LEAD
<br />Steve has 16 years of experience as a member of design and construction teams for a variety of municipal, trail,
<br />and highway projects. His duties have included quantity calculation and project cost estimation, intersection design
<br />and details, alignments, profiles, utility design and coordination, corridor and terrain modeling, and construction
<br />management. Steve has designed and delivered projects in both AutoCAD Civil 3d and MicroStation platforms.
<br />Highlighted Project Experience
<br />Three Rivers Park District, Crystal Lake Regional Trail, Robbinsdale, Minnesota. A 2.5-mile bituminous trail was added through a challeng-
<br />ing urban environment to enhance multimodal transportation opportunities in a developing corridor and provide connectivity to existing trail
<br />networks in Minneapolis. Steve served as the civil design lead and construction manager.
<br />Bottineau Community Works Infrastructure Advanced Planning, Twin Cities, Minnesota. Steve worked to advance the planning and
<br />design of desired pedestrian and bicycle infrastructure enhancements. His involvement included researching the feasibility of shared mobility
<br />features, incorporate shared mobility features, such as bike sharing, to allow for increased use of new bicycle facilities, and support alternative
<br />approaches for transit users to make first and last mile connections that will result in better access and use of the METRO Blue Line Extension.
<br />Minneapolis Park and Recreation Board Ridgway Parkway Improvements, Minneapolis, Minnesota. A one-mile concrete walk was
<br />replaced with bituminous trail, a loop parking area was reconstructed, and a tiered scenic overlook was added to complete a “missing link”
<br />in the Minneapolis Parks trail network. Steve served as the civil design lead and construction manager.
<br />Other Trail Experience
<br />Three Rivers Park District, Dakota Rail Trail and St Bonifacius Extension, Hennepin County, Minnesota. Member of Civil Design Team
<br />City of Plymouth Parks, Northwest Greenway Trail Phase II, Plymouth, Minnesota. Member of Civil Design Team
<br />City of Plymouth Parks, Northwest Greenway Trail Phase III, Plymouth, Minnesota. Civil Design Lead.
<br />20+ Significant Utility
<br />Coordination Projects
<br />34 Miles of Trail Design &
<br />Planning
<br />NICOLE ZAPPETILLO | WETLANDS
<br />Nicole has 11 years of environmental science
<br />experience including numerous wetland delin-
<br />eations, wetland permitting, agency coordina-
<br />tion, and environmental documentation for pub-
<br />lic and private projects. Her work at SRF includes
<br />completing wetland delineations and reports,
<br />Minnesota Wetland Conservation Act and U.S. Army Corps of Engi-
<br />neers Section 404 permit applications, agency coordination, and
<br />federal and state environmental documents.
<br />Project Experience
<br />Trunk Highway 5 Regional Trail, Victoria and Chanhassen, Min-
<br />nesota. Completed a field wetland delineation, delineation reports,
<br />and agency coordination for a proposed segment of regional multi-
<br />use trail, including bituminous and boardwalk trail segments. The
<br />trail will be located within Minnesota (MN) Department of Transpor-
<br />tation right of way and the University of Minnesota Landscape Arbo-
<br />retum. In addition, the trail will likely impact a Minnesota Department
<br />of Resources Public Water Wetland.
<br />France Avenue Trail from West 84th Street to Old Shakopee Road,
<br />Bloomington, Minnesota. Completed a field wetland delineation,
<br />delineation reports and agency coordination, and wetland permitting
<br />is in progress for a segment of a local multi-use trail, including bitumi-
<br />nous and boardwalk trail segments and a stream crossing. The project
<br />includes a long segment of boardwalk to avoid/minimize wetland and
<br />floodplain impacts to a stream and the surrounding wetland complex.
<br />Northwest Greenway Trail Phases I-IV, Plymouth, Minnesota.
<br />Completed field wetland delineations, delineation reports, agency
<br />coordination, and wetland permitting for several segments of a
<br />regional multi-use trail, including bituminous and boardwalk trail
<br />segments and a stream crossing. Most of the work was in the vicinity
<br />of a large wetland complex.
<br />DAVID FILIPIAK, PE | WATER RESOURCES
<br /> David leads SRF’s Water Resources Group, pro-
<br />viding review and oversight with 36 years of
<br />experience in engineering and water resources
<br />planning. His expertise includes hydrologic and
<br />hydraulic modeling of both urban and rural
<br />watersheds, preliminary and final design for
<br />major storm sewer projects, regional and site-specific Best Manage-
<br />ment Practice design, green infrastructure studies and design, com-
<br />plex permitting, and major wetland restoration projects. He excels at
<br />developing innovative stormwater treatment solutions for both rural
<br />and urban projects. Additionally, he has served on numerous techni-
<br />cal advisory committees, including the Minnehaha Creek Hydrology
<br />and Hydraulics Study, several Local Road Research Board (LRRB)
<br />studies on a variety of topics, Modeling, and a MPCA study on Water
<br />Quality Sampling Protocols.
<br />Project Experience
<br />1NE Watershed Planning and Preliminary Design Project, Minne-
<br />apolis, Minnesota. The project includes development and detailed
<br />analysis of multiple stormwater management scenarios that address
|