Laserfiche WebLink
Transportation Engineers Trip Generation Manual. For properties with multiple driveways, <br />engineering judgement will be used to estimate an appropriate directional distribution of <br />generated trips. The following properties will be subjects of this traffic analysis: <br /> <br />- Lexington Station (multiple driveways) <br />- Big O Tires <br />- Arby’s <br />- Raising Cane’s (multiple driveways) <br />- Target (multiple driveways) <br /> <br />For purpose of determining traffic signal system assessments on the west side of Lexington <br />Avenue, two scenarios will be developed: <br /> <br />- Scenario #1 – Driveway connection between the Big O Tires property and <br />the Lexington Station property is coordinated between the property owners <br />and the City of Arden Hills and the property owners construct the driveway <br />connection <br />- Scenario #2 – No driveway connection is made between the above- <br />mentioned properties and the Lexington Station development is the sole <br />property accessing the west leg of the new signalized intersection. <br /> <br />Task 2.0 Feasibility Report <br /> <br />2.1 Prepare draft feasibility report containing the above listed information. <br />2.2 Revise report one time based on comments received from the City of Arden Hills and the <br />City of Shoreview. Submit final signed report. <br /> <br />Assumptions <br /> <br />Our work scope, staff hour and fee are based on the following assumptions: <br /> <br />1. Effort to prepare exhibits for the report will be kept to a minimum. A layout for the project <br />has been developed for use by the County. Simple exhibits will be prepared for other work <br />elements, such as watermain and sanitary sewer work, if needed. <br />2. This scope does not include meetings. It is assumed that review comments will be discussed <br />via phone or email. <br />3. This scope does not include time to attend City Council meetings. Meeting attendance and <br />preparation of presentations can be provided as additional services. <br />4. The cities will provide a copy of the appropriate site plan for Lexington Station Phase 3 for <br />our use. <br /> <br />Project Schedule <br /> <br />Alliant will work with the City of Shoreview, City of Arden Hills, and their partners to schedule tasks and <br />milestones as needed to meet the goals of the cites. Upon acceptance of this proposal, a draft report can <br />be provided within three calendar weeks. <br /> <br /> <br /> <br /> <br />