My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
02-22-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 3:32:51 PM
Creation date
2/18/2021 3:31:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2550 University Avenue West | Suite 400N | St. Paul, MN 55114 <br /> Main 651.644.4389 + Fax 651.644.9446 <br />HRGREEN.COM <br /> <br /> <br /> <br /> <br /> <br />February 17, 2021 <br />Mr. Dave Perrault, MBA, MPA <br />City Administrator <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />Re: Proposal to Provide On-Call Engineering Services & Serve as Engineer of Record <br /> <br />Dear Mr. Perrault: <br />We are pleased to provide you with our proposal to provide on call services and to serve as engineer of record <br />for the City of Arden Hills. We understand that given the staff transition taking place at the City , you will require <br />assistance with a variety of technical and administrative tasks. As you are aware, our team has served the City <br />for many years and we currently provide similar services to over 50 other communities. <br />We will bill our services at the hourly rates specific to the staff person performing the work. We anticipate being <br />requested to perform work in the following areas; General Consultation, Meeting Attendance, Stormwater Design, <br />Stormwater Compliance, Traffic Engineering, Transportation Design, Pavement Management, Plan Review, <br />Construction Administration, & Construction Observation. We will assign Project Managers that you are familiar <br />with to each project as the need arises. Our anticipated Project Managers have bill rates between $155 to <br />$185/hr. The Project Managers will partner with Design Technicians and Staff Engineers with bill rates between <br />$90 to $128/hr to complete the work. Where they provide additional value, Project Engineers with bill rates <br />between $134 to $159/hr will be relied on. Should the City require placement of an HR Green engineer at City <br />Hall please let us know, we have staff that could fill this role as well. <br />We appreciate the opportunity to present our proposal and continue our work with the City of Arden Hills. Thank <br />you for your thoughtful consideration. While I (Chris) will serve as the main contact for this effort, our Project <br />Managers are fully capable of driving their own projects forward. In addition, we have the full support of our <br />Water and Transportation Regional Directors, should they be required. If you require additional information or <br />have any questions, please contact me at 651-500-2750 or charrington@hrgreen.com. <br />Sincerely, <br />HR GREEN, INC <br /> <br /> <br />Chris Harrington, PE Tim Korby, PE John Morast, PE <br />Client Services Manager Regional Director - Water Regional Director - Transportation
The URL can be used to link to this page
Your browser does not support the video tag.