Laserfiche WebLink
City of Arden Hills <br />Planning Commission Meeting for April 7, 2021 <br />P:\Planning\Planning Cases\2021\21-001 - BSC Bldg 14 Addition - APUD\PC Packets <br />Page 6 of 10 <br />Retail -1 space per 150 <br />SF of gross sales floor <br />space <br />75,262 sq. <br />ft.502 437 -65 <br />At this time, staff has not seen an interior floor plan and cannot determine the required parking as <br />the proposed project could host a variety of uses (retail, office, and storage). Each use is subject to <br />minimum parking requirements in the Zoning Code and could offset the parking deficiencies. <br />H. Freestanding Signs –Flexibility Requested <br />Properties in Sign District 5 are allowed one freestanding sign measuring up to 100 square feet in <br />area and not exceeding 16 feet in height. The Applicant would like to utilize the previously PUD <br />approved monument sign standards. The approved monument signs measure 26 feet in height and <br />have a total sign copy area of 171.9 square feet (see Attachment F). <br />I. Wall Signs – Flexibility Requested <br />Properties in Sign District 5 are allowed wall signs up to 80 square feet. The Applicant is <br />requesting flexibly for a 90 and 180 square feet sign above the main entrances to the building (east <br />elevation facing Lexington Ave) and a 90 square feet sign on the north elevation (facing previous <br />Lexington Station phases and Red Fox Road). <br />2.Traffic Study and Proposed New Lexington Avenue Access <br />A traffic study has been prepared (see Attachment G). This study is currently being reviewed by <br />the city’s traffic consultant. The study reviewed existing operations within the area, evaluated <br />traffic impacts to the roadway network, and recommended improvements to the proposed <br />development site. SRF and the Applicant are aware that the County intends to reconstruct <br />Lexington Avenue between County Road E and I-694 in 2022, and included that in the <br />evaluation. In summary, the proposed development is expected to generate approximately 165 <br />a.m. peak hour, 398 p.m. peak hour, and 4,592 daily site trips. Results of the year 2023 build <br />operations analysis indicate the Lexington Avenue/Target Road intersection cross-street <br />approach movements are expected to have significant queuing and delay as an unsignalized <br />intersection. The proposed eastbound approach vehicle queuing storage is limited (approximately <br />100 feet). Infrequently, when this storage is filled, queues are expected to extend into the parking <br />lot, which may infrequently and for very brief periods of time, block parking maneuvers to and <br />from the southernmost parking stalls along the east face of the proposed building. With a future <br />traffic signal, the site eastbound queues are expected to be reduced significantly, however, they <br />may continue to infrequently and for very brief periods of time, extend beyond the limited storage <br />during the p.m. peak hour. <br />A new access driveway in alignment with the Target service road is proposed to be constructed <br />during the project. The existing driveway on Lexington Avenue that serves Phase I and Phase II is <br />a temporary access point that is scheduled to close. The proposed new access driveway at the <br />southern end of the site is approved as the sole permanent access off of Lexington Avenue. The <br />proposed new access/intersection would include a traffic signal. The proposed traffic signal is <br />included in the Ramsey County Lexington Avenue reconstruction project that is anticipated to start <br />in 2022. The Applicant has also worked with Ramsey County to determine the alignment of the <br />right-turn lane from Lexington Avenue into this site, and have reached an agreement about this <br />alignment.