Laserfiche WebLink
<br />Z 2550 University Avenue West | Suite 400N | St. Paul, MN 55114 <br /> Main 651.644.4389 + Fax 651.644.9446 <br />ZHRGREEN.COM <br /> <br /> <br /> <br />March 4, 2021 <br />David Swearingen, PE, <br />Public Works Director/City Engineer <br />Arden Hills City Hall <br />1245 W Highway 96 <br />Arden Hills, MN 55112 <br /> <br />Re: Lexington Station Phase III Development - Engineering Plan Review Comments <br /> <br />Dear David, <br />An engineering plan review has been performed on the 2021 Land Use Application, signed Feb. 15, 2021 for the <br />Lexington Station – Phase III Development. A summary of the review comments follows: <br /> <br />LAND USE APPLICATION <br />1. Application notes 4.23 ac. Plans show 4.24 ac. Confirm correct size and correct. <br /> <br />NOOR LETTER <br />2. Proposed development is increasing building size by approximately 30%. <br />3. A total of 200 parking stalls are noted. This appears to be missing a bank of stall on the plans. Confirm <br />final number. <br />4. Total Development parking is noted to increase to 416. What was the original approval for parking? <br /> <br />LOCATION MAP (Attachment B) <br />5. Add a north arrow for orientation. <br /> <br />SURVEY <br />6. Confirm all easements on the site have been identified and included. <br />7. Gross area is listed as 4.24 ac. Application shows 4.23 ac. <br /> <br />PLAN SHEETS <br />C100 – DEMOLITION PLAN <br />8. Add a legend to the plan <br />9. Identify items noted in the demolition notes: <br /> Attachment H