My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04 April 2021
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2020-2029
>
2021
>
04 April 2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 1:02:06 PM
Creation date
4/6/2021 12:59:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spring Road Construction <br />If you are preparing to tackle a home improvement <br />project this spring, keep in mind you may be <br />required to obtain a permit through the City before <br />starting construction. Exterior additions such as a <br />deck, shed, and fencing require a zoning permit; <br />interior projects such as basement finishing and <br />replacing windows will require a building permit; <br />and replacement of a water heater, furnace, or <br />AC system will need a mechanical permit. This is <br />only a partial list: for a full list of which projects <br />necessitate a permit, visit the City’s Building & <br />Permits web page at cityofardenhills.org/154/ <br />Building-Permits. <br />Upon approval of the permit, construction must be started within 180 days or a new permit will be required. <br />Upon finishing work, please make sure to contact the City so an inspection may be conducted. A minimum <br />notice of 24 hours is required for all inspections. For any questions about permits or inspections, contact <br />Building Official Rob Ward at 651-792-7813. <br />Reminder: Permits Needed for Many Remodeling Projects <br />Buckthorn is an invasive species that negatively impacts local <br />plant life diversity. To get rid of it, you have to pull it up by <br />the roots or cut it down and spray the stump with a powerful <br />herbicide that will prevent it from coming back and spreading. <br />By request, the Public Works Department will pick up buckthorn <br />from residential homes on Fridays from the end of May through <br />the end of October. Residents are required to place the buckthorn <br />in neat, manageable piles along the street curb. Please note that <br />only buckthorn will be accepted. <br />To arrange for a buckthorn pick up, you must complete and <br />submit the Buckthorn Pick-Up Request form. The deadline for <br />same-week pick up is noon on Thursdays. If a form is submitted <br />after noon on Thursdays, the buckthorn will be picked up on <br />Friday of the following week. <br />For more information and to arrange for a pick up, visit <br />the City’s buckthorn web page at cityofardenhills.org/308/ <br />Buckthorn. <br />Buckthorn Removal and Disposal Options <br />The following road construction <br />and improvement projects are <br />scheduled to start this spring in <br />Arden Hills: <br />• Street and utility improvements <br />within the Hazelnut Park <br />neighborhood, including an <br />evaluation of pavement and <br />utilities along Lake Valentine <br />Road. <br />• Installation of two new <br />pedestrian crosswalks with <br />raised medians along Hamline <br />Avenue near Wyncrest Court <br />and Indian Oaks Circle. <br />• Installation of drainable <br />improvements along with north <br />portion of Shorewood drive to <br />resolve local flooding issues. <br />• Karth Lake Runoff Control <br />Project near Cummings Park. <br />For project details and updates, <br />visit our Road Construction <br />Projects web page at <br />cityofardenhills.org/216/Road- <br />Construction-Projects.
The URL can be used to link to this page
Your browser does not support the video tag.