My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
04-12-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 2:52:22 PM
Creation date
4/8/2021 2:45:26 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION – MARCH 15, 2021 6 <br /> <br />Mr. Larson added that they equipment is significantly more efficient installed directly adjacent to <br />the space and overhead for ductwork and air returns. <br /> <br />Councilmember Holmes said it seemed from the last noise study they are right at the limit <br />borderline. <br /> <br />Mr. Larson reiterated they are working on the design to make sure additional sound is mitigated <br />and the new equipment won’t add to the noise. <br /> <br />Boston Scientific Environmental Health and Safety Specialist Sue Thompson stated that <br />Boston Scientific is currently at 48.9 decibels. Adding in the additional units will only raise the <br />decibels by about .8, and not make a drastic change on the amount of noise. <br /> <br />Councilmember Holmes suggested that Boston Scientific appoint a neighborhood liaison so <br />neighbors have a particular person to contact with concerns. <br /> <br />Mayor Grant asked if they will be reusing the space once the existing HVAC equipment is <br />removed. <br /> <br />Boston Scientific Facilities Director Lorne Rothbauer said there is one piece of equipment on <br />the north side of the building that can be eliminated once the new addition is built. There will still <br />be some equipment on that side of the building but most of the noise the neighbors are hearing is <br />the chiller that will be eliminated when it needs to be replaced. <br /> <br />Councilmember Holden asked if as if the sound gets louder as the equipment ages. <br /> <br />Mr. Hejl responded that may be true if the equipment wasn’t maintained but they have a <br />preventative maintenance program and equipment is inspected and repaired quarterly. <br /> <br />Councilmember McClung asked about receptor placement during the noise studies, he wondered <br />if they were at the height of a person, or possibly at the height of a deck or second story bedroom. <br /> <br />Mr. Ford said receptors are put at the height of the person who would be receiving the noise. <br /> <br />Mr. Rothbauer said they can ask to have the study modified. <br /> <br />Boston Scientific Environmental Health and Safety Specialist Nicole Lancaster explained the <br />site operates under a permit from the Minnesota Pollution Control Agency (MPCA). Boston <br />Scientific has held the permit since 1995 and they must complete emissions reporting to show <br />they are in compliance. They are not close to the threshold and aren’t concerned about the <br />building expansion having a negative impact to the neighbors. There won’t be any change in <br />types of emissions coming from the facility. Boston Scientific has no knowledge of historical <br />spills or leakage. <br /> <br />Ms. Lancaster said in regard to land and water testing, they have done some testing. In 2019 they <br />had soil testing that was mitigated to the MPCA’s satisfaction in October of 2020. They also <br />partner with the Rice Creek Water District; each construction project has to be approved by the
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).