Laserfiche WebLink
Page 2 of 2 <br /> <br /> <br />The low bid is lower than the Engineer’s Estimate which is $3,234,599.50. The bid tabulation <br />summary is included as Attachment A with a detailed bid abstract included as Attachment D. <br /> <br />C&L Excavating has completed similar projects successfully in the metro area. Attached is a letter <br />(Attachment B) from Bolton & Menk recommending award to C&L Excavating, Inc. as the lowest <br />responsible/responsive bidder. Attachment C is Resolution 2021-021 awarding the 2021 PMP Street <br />and Utility Improvements to C&L Excavating, Inc. in the amount of $2,704,412.10. Staff <br />recommends adoption of Resolution 2021-021. <br /> <br /> <br />Attachments <br />Attachment A: Bid Tabulation Summary <br />Attachment B: Bolton & Menk Letter <br />Assessment C: Resolution 2021-021 <br />Attachment D: Detailed Bid Abstract <br /> <br /> <br /> <br /> <br />