Laserfiche WebLink
Abstract of BidsUEI Project No.19.00419Bid Letting: Wednesday, March 31, 2021Engineer's Estimate$125,620Karth Lake Runoff Control - PW 20-0111Arden Hills, MNNo. ItemAmount Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total1 Mobilization1 LS 5,000.00 $5,000.00 12,800.00 $12,800.00 13,725.00 $13,725.00 7,500.00 $7,500.002 Clearing and Grubbing1 LS 1,200.00 $1,200.00 7,000.00 $7,000.00 20,000.00 $20,000.00 3,000.00 $3,000.003 Topsoil Stripping1 LS 2,500.00 $2,500.00 1,000.00 $1,000.00 2,100.00 $2,100.00 5,000.00 $5,000.004 Remove Bituminous Pavement 34 SY 50.00 $1,700.00 10.00 $340.00 20.00 $680.00 5.00 $170.005 Remove Concrete Structure 1 LS 2,500.00 $2,500.00 1,500.00 $1,500.00 10,500.00 $10,500.00 3,000.00 $3,000.006 Remove Grouted Riprap1 LS 2,700.00 $2,700.00 1,500.00 $1,500.00 5,250.00 $5,250.00 750.00 $750.007 Remove 18" CPP Storm Sewer 1 LS 1,500.00 $1,500.00 850.00 $850.00 5,250.00 $5,250.00 1,200.00 $1,200.008 Common Excavation (CV) 100 CY 50.00 $5,000.00 35.00 $3,500.00 70.00 $7,000.00 10.00 $1,000.009 Aggregate Base (CV) Class 5 10 CY 40.00 $400.00 80.00 $800.00 55.40 $554.00 20.00 $200.0010 Concrete Inlet Structure1 Each 39,000.00 $39,000.00 28,500.00 $28,500.00 18,150.00 $18,150.00 71,165.00 $71,165.0011 24" RC Storm Sewer Pipe Class 3 170 LF 120.00 $20,400.00 75.00 $12,750.00 114.06 $19,390.20 130.00 $22,100.0012 36"x22" Arch RC Storm Sewer Pipe Class 3 50 LF 200.00 $10,000.00 169.00 $8,450.00 165.66 $8,283.00 150.00 $7,500.0013 36"x22" Arch RC Pipe Apron 1 Each 2,600.00 $2,600.00 1,650.00 $1,650.00 2,629.38 $2,629.38 6,500.00 $6,500.0014 Storm Manhole 60"4 VF 1,000.00 $4,000.00 950.00 $3,800.00 2,263.13 $9,052.52 1,500.00 $6,000.0015 Storm Manhole 84"8 VF 1,200.00 $9,600.00 950.00 $7,600.00 6,895.00 $55,160.00 1,175.00 $9,400.0016 Connect to Existing Storm Sewer 1 Each 800.00 $800.00 700.00 $700.00 5,250.00 $5,250.00 1,500.00 $1,500.0017 Pipe Bedding Material10 CY 40.00 $400.00 80.00 $800.00 84.00 $840.00 30.00 $300.0018 Safety Grate for 36-in Arch RC Apron 1 Each 2,200.00 $2,200.00 1,600.00 $1,600.00 2,374.00 $2,374.00 2,000.00 $2,000.0019 Random Rip Rap (Class III) 90 CY 100.00 $9,000.00 130.00 $11,700.00 183.76 $16,538.40 55.00 $4,950.0020 Install Type III Barricade 6' Wide 2 Each 800.00 $1,600.00 300.00 $600.00 787.50 $1,575.00 750.00 $1,500.0021 Turf Reinforcement Mat Type Category 2 640 SY 16.00 $10,240.00 14.60 $9,344.00 15.75 $10,080.00 6.00 $3,840.0022 Filter Log Type Straw Bioroll 100 LF 2.00 $200.00 3.00 $300.00 10.50 $1,050.00 3.00 $300.0023 Turf Establishement1 LS 2,200.00 $2,200.00 7,000.00 $7,000.00 5,250.00 $5,250.00 3,000.00 $3,000.0024 Erosion Control Blanket Category 3 510 SY 2.00 $1,020.00 1.45 $739.50 10.50 $5,355.00 2.50 $1,275.0025 Silt Fence, Type HI100 LF 2.00 $200.00 4.50 $450.00 10.50 $1,050.00 3.00 $300.00$135,960.00 $125,273.50 $227,086.50 $163,450.00TOTAL PROJECT BIDPember Companies Inc. Northdale Construction Co., Inc.Menomonie, Wisconsin Albertville, MinnesotaVinco Inc.Forest Lake, MinnesotaLametti & Sons, Inc.Hugo, Minnesota