My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-21-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
04-19-21-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 3:08:17 PM
Creation date
4/15/2021 3:06:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />187184v1 5 <br />without further notice or action. Upon completion of the public improvements, the City shall inspect the <br />public improvements and notify Developer if any of the improvements do not conform to the requirements <br />of this Agreement. Upon compliance with this Agreement with respect to public improvements, the City <br />shall give formal notice of acceptance to Developer and thereafter Developer shall have responsibility with <br />respect to the maintenance of the public improvements as described in Section 16 and Exhibit BE. <br /> The Developer shall, at its expense, prepare any streets for snowplowing and other maintenance that <br />the Developer wishes the City to undertake prior to formal acceptance by the City of such streets. This <br />preparation shall include, without limitations, ramping any manholes as necessary to avoid damage to <br />snowplows or other vehicles used in street maintenance. Should damage occur to City snowplows or other <br />vehicles during the course of snowplowing or other maintenance procedures prior to formal acceptance of <br />the street by the City, the Developer shall pay all such damages and shall indemnify and hold the City <br />harmless for all such damage, cost, or expense incurred by the City with regard thereto. <br /> 10. WARRANTY. The Developer warrants all public improvements required to be <br />constructed by it pursuant to this Agreement for a period of twenty-four (24) months from the date of <br />acceptance by the City against poor material and faulty workmanship. All trees and shrubs shall be <br />warranted to be alive, of good quality, and disease free for twenty-four (24) months after planting. Any <br />replacements shall be warranted for twenty-four (24) months from the time of planting. <br /> 11. IRON MONUMENTS. In accordance with Minnesota Statutes 505.021 and Arden Hills <br />City Code Section 1140.01 the final placement of iron monuments for all lot corners must be completed <br />before the applicable security is released. The Developer's surveyor shall also submit a written notice to the <br />City certifying that the monuments have been installed. <br /> 12. PERMITS. The Developer shall obtain or require its contractors and subcontractors to <br />obtain all necessary permits, including but not limited to the following to the extent required: <br />x Ramsey County for County Road Access and Work in County Rights-of-Way <br />x MnDot for State Highway Access
The URL can be used to link to this page
Your browser does not support the video tag.