My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-21-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
04-19-21-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 3:08:17 PM
Creation date
4/15/2021 3:06:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />187184v1 6 <br />x Minnesota Department of Health for Watermains <br />x MPCA for Storm Water Issues, Sanitary Sewer and Hazardous Material Removal <br />and Disposal <br />x DNR for Dewatering <br />x City of Arden Hills for Building Permits <br />x City of Arden Hills Grading and Erosion Control Permit <br />x Rice Creek Watershed District <br />x NPDES Stormwater Permit <br />x Any other permits that may be required <br /> <br />13. DEWATERING. Due to the variable nature of groundwater levels and stormwater <br />flows, it will be the Developer’s and the Developer’s contractors and subcontractors responsibility to <br />satisfy themselves with regard to the elevation of groundwater in the area and the level of effort needed to <br />perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all <br />applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations <br />permits shall also be strictly followed. <br />14. TIME OF PERFORMANCE. The Developer shall furnish and install all required <br />public and private improvements in accordance with the Plans approved by the City on or before October <br />30, 20210May 1, 2023. The Developer may, however, request an extension of time from the City. If an <br />extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect <br />cost increases and the extended completion date. Final wear course placement must have the written <br />approval of the City Engineer, and may be delayed or scheduled at any time of the year based upon <br />existing site conditions at the discretion of the City Engineer. <br /> 15. LICENSE. The Developer hereby grants the City, its agents, employees, officers and <br />contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in <br />conjunction with plat development. <br /> 16. OPERATION, MAINTENANCE AND EASEMENTS. The Developer shall provide for <br />the operation, maintenance and dedication of easements for proposed facility improvements in accordance
The URL can be used to link to this page
Your browser does not support the video tag.