My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-21-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
04-19-21-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 3:08:17 PM
Creation date
4/15/2021 3:06:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />187184v1 7 <br />with the executed Stormwater and Recreational Facilities Operation, Maintenance and Easement <br />Agreement as provided in Exhibit BE. <br />17. EROSION CONTROL. Prior to initiating site grading, the erosion control plan shall be <br />implemented by the Developer and inspected and approved by the City. The City may impose additional <br />erosion control requirements if reasonably required. All areas disturbed by the excavation and backfilling <br />operations shall be reseeded within fourteen ive (145) days after the completion of the work, weather <br />permitting, or in an area that is inactive for more than ten (10) days unless authorized and approved by the <br />City Engineer. Except as otherwise provided in the erosion control plan, seed shall be in accordance with the <br />City's current seeding specification which may include certified oat seed to provide a temporary ground <br />cover as rapidly as possible. All seeded areas shall be maintained as necessary for seed retention. The parties <br />recognize that time is of the essence in controlling erosion. If the Developer does not comply with the <br />erosion control plan and schedule or supplementary instructions received from the City, the City may take <br />such action as it deems appropriate to control erosion. The City will endeavor to notify the Developer in <br />advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's <br />rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred <br />for such work within ten thirty (3010) days, the City may draw down the letter of credit to pay any costs. No <br />development, street or utility construction will be allowed and no building permits will be issued unless the <br />plat is in full compliance with the approved erosion control plan.[MM1][MM2]. <br /> 18. GRADING PLAN. The plat shall be graded in accordance with the approved grading <br />development and erosion control plan. The plan shall conform to City of Arden Hills specifications. Within <br />thirty (30) days after Prior to the issuance of a Certificate of Occupancy completion of the grading and <br />before the City approves individual building permits the Developer shall provide the City with an "as <br />constructed" grading plan certified by a registered land surveyor or engineer that all ponds, swales, and <br />ditches for public drainage have been constructed on public easements or land owned by the City. <br />Notwithstanding the foregoing, the City may issue building permits to the Developer, prior to completion
The URL can be used to link to this page
Your browser does not support the video tag.