My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-10-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
05-10-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 3:56:15 PM
Creation date
5/6/2021 3:54:41 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br /> <br />Staff will mail notices to adjacent properties, following authorization to proceed, of the proposed <br />paving area and project schedule. Information will also be posted on the City’s website under <br />the construction projects web page. <br /> <br />Budget Impact <br /> <br />The following table summarizes the estimated expenditures for the project. Funding for this <br />work is included in the 2021 Operating Budget under Street Maintenance, Sealcoating and <br />Resurfacing, and the Surface Water Management Fund. The project will not include special <br />assessments. <br /> <br /> Estimated Street Expenses: <br />Item Est. Cost <br />Machine Rental $4,500 <br />Bituminous Material (650 tons) $45,500 <br />Trucking $10,000 <br />Pavement Milling Contract $9,000 <br />Tack Coat Application $4,000 <br />Misc. Supplies / Traffic Control $2,000 <br />10% contingency $7,500 <br />TOTAL STREET ESTIMATE $82,500 <br /> <br /> Estimated Drainage Expenses: <br />Item <br />Est. <br />Cost <br />Catch Basin Repairs $5,500 <br />Spot Curb Repairs $14,750 <br />10% contingency $2,025 <br />TOTAL STORM WATER ESTIMATE $22,275 <br /> <br /> <br />Attachments <br /> <br />Attachment A: Project Area Map <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.