My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-10-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
05-10-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 3:56:15 PM
Creation date
5/6/2021 3:54:41 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />services (Attachment A) is recommended by staff to maintain quality services through the entirety <br />of the project. <br /> <br />Budget Impact <br /> <br />The initial proposal provided by HR Green included fees of $45,762 for design and $7,234 for <br />construction observation, for a total of $52,996 in consulting fees for the project. The proposed <br />amendment for changes to the scope of work has a total of $17,536 bringing the total Design and <br />Construction Contract with HR Green to $70,532. Project funding is provided by the PIR fund, <br />Ramsey County participation and surface water fund. <br /> <br /> Project Budget: <br />Hamline Ave Crosswalks $120,000.00 (estimated $60,000 Ramsey County participation) <br />Shorewood Drive Drainage $ 90,000.00 <br />Budget Total $210,000.00 <br /> <br /> Actual Costs: <br />Construction Contract 133,421.65$ <br />Engineering 83,879.40$ <br />Materials Testing 6,293.00$ <br />Construction Admin 6,900.00$ <br />Misc (Legal, Ads)658.65$ <br />Construction Total 231,152.70$ <br />Attachments <br />Attachment A: Proposed Amendment for Changes to Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.