Laserfiche WebLink
Page 5 of 6 <br /> <br /> <br /> <br />Trash Pick Up – Meets Requirements <br />The Applicant is proposing a dual bin trash enclosure, situated at the Northeast corner of the <br />parking lot. Section 1325.05 Subd. 8, K requires trash and recycling equipment, materials, and <br />containers to be fully enclosed and integrated into the architecture of the building. The two trash <br />bins will be enclosed using Burnished Block. <br />Pedestrian and Bicycle Circulation – Meets Requirements <br />Section 1325.05 Subd. 8, P states new building construction shall include construction of a <br />minimum of six (6) foot concrete sidewalk adjacent to or in all right-of-way. The sidewalks on the <br />north and west sides of the property are eight (8) foot concrete paths that conform to zoning <br />requirements, and these will remain in place. The existing trial on the south side of the property is <br />a five (5) foot bituminous pavement trail and does not conform to zoning requirements. The <br />applicant is proposing to replace this trail with a (6) foot concrete sidewalk.