My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
06-28-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 4:28:13 PM
Creation date
6/24/2021 4:06:57 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 4 <br />C. Issue addenda necessary to address project related questions during bidding. <br />D. Attend bid opening and prepare certified bid tabulation. <br /> <br />TASK 9: Construction Administration: Consultant will assist the City during the project <br />construction process, including the following items. <br />A. Conduct pre-construction meeting. <br />B. Review shop drawing submittals. <br />C. Provide construction staking for project improvements. <br />D. Provide on-site construction observation. <br />E. Conduct weekly construction meetings with contractor <br />F. Prepare progress payments and change order documents. <br />G. Coordinate material testing. <br />H. Provide monthly construction progress updates for City website <br />I. Prepare punch lists and provide final project inspection. <br />J. Prepare final as-build record drawings
The URL can be used to link to this page
Your browser does not support the video tag.