My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-12-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
07-12-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 12:53:55 PM
Creation date
7/13/2021 12:42:15 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2021-07-12 Final Version 7 <br /> 10. WARRANTY. The Developer warrants all Public Improvements required to be <br />constructed by it pursuant to this Agreement for a period of twenty-four (24) months from the <br />date of acceptance by the City against poor material and faulty workmanship. All trees and <br />shrubs shall be warranted to be alive, of good quality, and disease free when planted. <br /> 11. IRON MONUMENTS. In accordance with Minnesota Statutes 505.021 and <br />Arden Hills City Code Section 1140.01 the final placement of iron monuments for all lot corners <br />must be completed before the applicable security is released. The Developer's surveyor shall <br />also submit a written notice to the City certifying that the monuments have been installed. <br /> 12. PERMITS. The Developer shall obtain or require its contractors and <br />subcontractors to obtain, prior to any site activities, all necessary permits, including but not <br />limited to the following to the extent required: <br />• Ramsey County for County Road Access and Work in County Rights-of- <br />Way <br />• MnDot for State Highway Access <br />• Minnesota Department of Health for Watermains <br />• MPCA for Storm Water Issues, Sanitary Sewer and Hazardous Material <br />Removal and Disposal <br />• DNR for Dewatering <br />• Rice Creek Watershed District <br />• City of Arden Hills for Building Permits <br />• City of Arden Hills Grading and Erosion Control Permit <br />• City of Arden Hills Sewer Connect Permit <br /> <br />13. DEWATERING. Due to the variable nature of groundwater levels and <br />stormwater flows, it will be the Developer’s and the Developer’s contractors and subcontractors <br />responsibility to satisfy themselves with regard to the elevation of groundwater in the area and <br />the level of effort needed to perform dewatering and storm flow routing operations. All <br />dewatering shall be in accordance with all applicable county, state, and federal rules and <br />regulations. DNR regulations regarding appropriations permits shall also be strictly followed.
The URL can be used to link to this page
Your browser does not support the video tag.