My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-26-21-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
07-26-21-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 2:17:50 PM
Creation date
7/22/2021 2:17:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 20, 2021 <br />Page Two <br /> <br /> <br /> <br />New Building Projects: <br />5. Bethal U Land Sale: Trail move / redo w/Senior Housing Project (B’U land sale) (2021) <br />and new Fire Station in the future ( year ___??). (See 5a & 5b on map) <br />6. Trail along South Shore of Round Lake (from West to East) with: <br />a. New Gateway Bldg. – (2021+) <br />b. Redo path to tower (20__?) <br />c. Arden Hills segment (20__?) <br />d. Senior Housing Project – 1st trail segment (2021) <br />PTRC requests that the City Council authorize City Staff to “Scope & Concept” the <br />Trail. (See K.1a,b,c & d. <br /> <br />Trail Development Enhancements: <br />7. From County Road E / LJB along West side of Hwy 51 down to Glenhill Ave (Also City <br />of Roseville planning trail extension down to Lydia Avenue in the future. (See 1+ on <br />map). Roseville City Engineer, as of April 5th, is working with MN DOT ROW to <br />“SCOPE” trail. <br />8. Crepeau Nature Preserve Trails upgrade to improve drainage and to replace old surfaces. <br />Add Hamline Ave Trail-Extension. (See P on map). <br />Bethal U has “informally approved” that the Trail Extension can connect to Anderson <br />Center Trail System ( shorter trail segment) than the trail route previously proposed. <br /> <br /> <br />Future Trail Projects: <br />9. Rice Creek Commons- Trails along road & along water way. (See T.1 & T.2 on map). <br />Rice Creek North Regional Trail – Trail along West side of AHATS fence. (See T.3 on map). <br />PTRC anticipates full participation in Trails, Parks and Potential Civic Center builds. <br />10. Sunfish Lake Trail- fully completed in 2021, started in 2020. (See new U, on map). <br />AHATS staff should be contacted by City Staff about trail access – even if limited.
The URL can be used to link to this page
Your browser does not support the video tag.