<br />H:\ARDH\M20121694\1_Corres\C_To Others\Bid Evaluation Letter.docx <br /> <br />June 4, 2021 <br /> <br />City of Arden Hills <br />Mr. David Swearingen <br />1245 W Hwy 96 <br />Arden Hills, MN 55112 <br /> <br />Re: Bid Results <br /> Lift Station 10 Rehabilitation <br /> Arden Hills, Minnesota <br /> BMI Project No. M20.121694 <br /> <br />Dear Mr. Swearingen: <br /> <br />Five (5) bids were submitted for the Lift Station 10 Rehabilitation project on June 3, 2021. The <br />bids ranged from $130,700.00 to $249,500.00. The City is directly procuring the pumps and <br />controls so those costs should be added to the bid costs to get the total construction costs. The <br />Engineer’s Estimate for this project was $290,000.00 and this amount includes the pumps and <br />controls. The low bid price is from Vinco, Inc. <br /> <br />The following is a bid summary: <br /> <br /> Contractor Total Base Bid <br /> Vinco $130,700.00 <br /> Pember Companies $134,750.00 <br /> Minger Construction $145,000.00 <br /> CCS Contracting, Inc $148,400.00 <br /> Penn Contracting, Inc $249,500.00 <br /> <br />Based on the summary above, if the City Council wishes to award the Project to the lowest <br />bidder, then Vinco, Inc., should be awarded the Project on the Total Base Bid Amount of <br />$130,700.00. <br /> <br />Sincerely, <br />Bolton & Menk, Inc. <br /> <br /> <br /> <br />Seth A. Peterson, P.E. (MN, WI) <br />Principal Environmental Engineer