My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-14-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
06-14-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2021 1:30:20 PM
Creation date
8/31/2021 1:29:27 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br /> <br /> <br /> Bidder Total Bid <br />Vinco Inc. $130,700.00 <br />Pember Companies, Inc. $134,750.00 <br />Minger Construction $145,000.00 <br />CCS Contracting, Inc. $148,400.00 <br />Penn Contracting, Inc. $249,500.00 <br /> <br /> <br />The low bid, with the addition of the pumps and panel that are to be procured by the City, comes <br />to $210,815 which is lower than the Engineer’s estimate of $290,000. The difference is an <br />indication there is still competitive bidding even with the current higher material prices. <br /> <br />Bolton & Menk has worked with Vinco Inc. on a few projects and does not see any concerns <br />with their performance on lift station projects. Attached is a letter (Attachment A) from Bolton & <br />Menk recommending award to Vinco Inc. as the lowest responsible/responsive bidder. <br />Attachment B is Resolution 2021-034 awarding the Lift Station 10 Rehabilitation Project to <br />Vinco Inc. in the amount of $130,700.00. Staff recommends adoption of Resolution 2021-034. <br /> <br />Budget Impact <br /> <br />A summary of the estimated project costs and funding sources is provided below: <br /> <br />Total Project Costs <br /> Construction Cost $ 130,700.00 <br /> Pumps and Control Panel $ 80,115.00 <br /> Engineering Services $ 49,400.00 (Includes Construction Admin.) <br /> Misc. (Legal, Ads) $ 206.95 <br /> TOTAL $ 260,421.95 <br />. <br />This project will be covered by the sanitary sewer fund but the total project cost is $80,422 over <br />the budgeted amount. This will need to be factored in when creating the 2022-2026 CIP plan and <br />determining the 2022 Sewer rates. <br /> <br />Attachments <br /> <br />Attachment A: Bolton & Menk Bid Evaluation Letter <br />Attachment B: Resolution 2021-034 Awarding the Contract <br />Attachment C: Notice of Award to Contractor for Construction Contract
The URL can be used to link to this page
Your browser does not support the video tag.