Laserfiche WebLink
ϵͬϭϱͬϮϬϮϭ <br />ϳ <br />RCWD Requirements <br />‡Held meeting w/ RCWD Staff to confirm watershed requirements <br />‡Project is not considered a reconstruction by RCWD definitions <br />‡Reclaimed aggregate material will remain in place <br />‡Will not exceed stormwater management thresholds for exposure of underlying <br />soils <br />‡Stormwater management not required <br />‡Permitting required for erosion/sediment control and wetland impacts <br />Design Options & Preliminary <br />Construction Costs <br />ϭϯ <br />ϭϰ