CConditions of Approval7. A Grading and Erosion permit shall be obtained from the city’s Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County prior to the start of any site activities.8. Prior to the issuance of a grading permit, the City Engineer item identified in the October 11thReport to the City Council and the September 1, 2021 Engineering Division memo shall be addressed. All comments shall be adopted herein by reference. 9. The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit.10. Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and City Planner prior to the issuance of a grading and erosion control permit or other development permits.11. Upon completion of grading and utility work on the site, a grading as-built and utility as-built shall be provided to the City for review.12. Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site.13. The Applicant shall be responsible for protecting the proposed on-site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant.6