My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-11-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
10-11-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2021 1:26:17 PM
Creation date
10/7/2021 1:22:40 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Page 15 of 17 <br />access as presented. The City Engineer has also evaluated turning radius and determined the site <br />functionality to be sufficient. <br /> <br />3. 1355.04 Procedural Requirements for Specific Applications <br /> <br />A public hearing for a PUD Amendment request is required before the request can be brought <br />before the City Council. The applicant or its representative shall be given the opportunity to appear <br />before the Planning Commission to answer questions or give explanations regarding the proposal. <br />Upon completion of the public hearing and its study and consideration of the application, the <br />Planning Commission shall submit its written report, containing its findings, conclusions, and <br />recommendations as to the application, to the City Council. <br /> <br />Plan Evaluation Summary <br /> <br />The table below provides the performance standards for the B-3 District and the preliminary <br />analysis for the proposed development: <br /> <br />Ordinance Requirements B-3 District Standards Proposed Development <br />Maximum Floor Area Ratio (FAR) 0.8 Approx. 0.23 <br />Maximum Building Height 35 feet +/- 29 feet <br />Maximum Structure Coverage 40% 23% <br />Minimum Landscape Lot Area 25% 16.0% <br />Minimum Front Yard Setback 50 feet Bank/Dental: 19.2 feet – Lexington <br />Avenue and +/- 138 feet Grey Fox <br />Road <br />Aldi: 74 feet – Grey Fox Road <br />Minimum Rear Yard Setback 20 feet Bank/Dental: 21.4 feet <br />Aldi: 30 feet <br />Minimum Side Yard Setback 20 feet (min)/ <br />40 feet (total) <br />Bank/Dental: +/- 62 feet (min) / <br />N/A corner lot (total) <br /> <br />Aldi: 120 feet (east) and 10 feet <br />(west) <br />Building Positioning At Front Setback = 50 feet Bank/Dental: 19.2 feet – Lexington <br />Avenue and +/- 138 feet Grey Fox <br />Road <br />Aldi: 74 feet – Grey Fox Road <br />Minimum Parking Requirements 120 total stalls Flexibility requested under PUD with <br />shared parking - 140 total stalls <br />Off-Street Parking Setbacks 20 feet from ROW 5 feet <br />Building Façade 50% transparency at front Less than 50%, Varies between <br />building <br />Building Materials 75% brick, tile, natural <br />stone, decorative concrete, <br />transparent glass or any <br />combination thereof <br />Flexibility requested with proposed <br />materials and varies between <br />elevations. <br />Pedestrian and Bicycle Circulation 6 foot sidewalk None along Lexington Avenue – <br />Defers to project <br />6 foot – Grey Fox Road <br />Freestanding Sign Copy Area 100 square feet 108 square feet <br />Wall Signage Sign District 5 Wall Signage on multiple elevations <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.