My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
10-25-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2021 10:13:10 AM
Creation date
10/22/2021 10:09:59 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />construction completion date is November 2022. Staff recommends adoption of Resolution <br />2021-060 as provided in Attachment A. <br />The final plan set and specifications consist of 509 pages. Full copies of these documents are on <br />file and available upon request. <br /> <br />Budget Impact <br /> <br />The total estimated cost of the project is $10,200,000. The City’s cost participation in the project <br />includes an estimated amount of $228,220 for easement acquisition and $732,790 for <br />construction and engineering, for a total amount of $961,010. Staff recommends that the city <br />reserve a five percent contingency in funding estimates due to the complex nature of the project, <br />for a total estimated project cost of $1,010,000. The proposed funding sources are summarized in <br />the following table. <br /> <br />PIR Fund (roadway and signal replacement)206,127$ <br />Special Assessments (new Target Rd signal)196,000 <br />State Bonding Funds (water main replacement)500,000 <br />City Water Utility Fund 66,069 <br />LRIP Grant Funds 41,804 <br />Total Estimated Funding 1,010,000$ <br />Attachments <br /> <br />Attachment A: Resolution 2021-060 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.