My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-03-21-Planning Commission
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2021
>
11-03-21-Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 3:25:02 PM
Creation date
10/28/2021 3:23:02 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 7 of 9 <br />The Public Works Director/City Engineer is currently finalizing the review of plans submitted for <br />the parking lot expansion and underground retention system. The following is not intended to be <br />a complete list of reviews, but rather a brief overview to provide the Planning Commission with <br />preliminary list of items under review: <br /> <br />1. Stormwater Management and Maintenance <br />2. Underground Retention System <br />3. Easements <br />4. Access to Utilities <br />5. Driveway Accesses and Widths along Gateway Boulevard <br />6. Pond and Wetland Impacts <br /> <br />Findings of Fact <br /> <br />The Planning Commission must make a finding as to whether or not the proposed application <br />would adversely affect the surrounding neighborhood or the community as a whole based on the <br />aforementioned factors. Staff offers the following findings for consideration: <br /> <br />General Findings: <br />1. The Applicant has submitted an application for Site Plan Review to construct additional <br />parking previously identified as “proof of parking” at the subject property 4200 Round <br />Lake Road. <br />2. The Subject Property is located with the Gateway Business (“GB”) District and is guided <br />as Light Industrial & Office on the 2040 Land Use Plan. <br />3. The Applicant operates under a Master Planned Unit Development and has been approved <br />for construction of a 250,000 square foot office and warehouse facility on the Subject <br />Property. <br />4. Flexibility through the PUD process was granted in the following areas: parking setbacks, <br />minimum caliper inches, and perennials and shrubberies. <br />5. The proposed plan does not conflict with the general purpose and intent of the Zoning <br />Code or the Comprehensive Development Plan for the City. <br />6. The application is not anticipated to create a negative impact on the immediate area or the <br />community as a whole. <br />7. The proposed plan will not produce any permanent noise, odors, vibration, smoke, dust, <br />air pollution, heat, liquid, or solid waste, and other nuisance characteristics. <br />8. The proposed plan is not anticipated to have any impact on traffic or parking conditions. <br />9. The accessory off-street parking would be in compliance with all provisions of the Zoning <br />Code. <br />10. A public hearing is not required for Site Plan Review. <br /> <br />Proposed Motion Language <br /> <br />Staff has provided the following options and motion language for this case. <br /> <br />1. Recommend Approval with Conditions: Motion to recommend approval of Planning Case 21- <br />025 for Site Plan Review at 4200 Round Lake Road, based on the findings of fact and the
The URL can be used to link to this page
Your browser does not support the video tag.