Laserfiche WebLink
Page 1 of 2 <br /> <br />CONSENT ITEM – 3F <br /> <br />MEMORANDUM <br /> <br />DATE: November 8, 2021 <br /> <br />TO: Honorable Mayor and City Councilmembers <br /> Dave Perrault, City Administrator <br /> <br />FROM: David Swearingen, P.E. Public Works Director / City Engineer <br /> <br />SUBJECT: 2021 CIPP Lining Project Contract <br /> <br /> Budgeted Amount: Actual Amount: Funding Source: <br /> $220,000 $190,249.70 Sanitary Sewer Utility Fund, <br /> I & I Grant Funds <br /> <br />Council Should Consider <br /> <br />Motion to approve, table, or deny the following: <br /> <br />• Construction Contract with Insituform Technologies USA, LLC for the 2021 CIPP <br />Lining Project in the amount of $190,249.70. <br />All items need a simple majority for action unless otherwise noted. <br /> <br />Background/Discussion <br /> <br />Through the sanitary sewer maintenance program, inspections identified four segments of sewer <br />needing repairs due to significant cracks or voids in the pipes and also segments of clay pipe that <br />indicated a need for lining rehabilitation. The location of the four areas are identified on the map <br />within Attachment B. <br />On September 27, 2021, a solicitation package was mailed to three contractors to obtain bids for <br />installing cured in place pipe (CIPP) lining for the four deteriorated pipe segments. A total of <br />three bids were received on October 18, 2021. A tabulation of the project bids is provided in <br />Attachment A. <br />