My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-08-21-SR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
11-08-21-SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 12:24:08 PM
Creation date
11/5/2021 12:23:36 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2021 CIPP PROJECT AGREEMENT <br />PW-21-0101 1 of 5 <br />AGREEMENT BETWEEN OWNER AND CONTRACTOR <br />FOR CONSTRUCTION CONTRACT <br /> <br /> <br />THIS AGREEMENT is made this 8th day of November, 2021 (hereinafter “Effective Date of the Contract”) <br />by and between the City of Arden Hills, Ramsey County, Minnesota (hereinafter “Owner”) and Inaituform <br />(hereinafter “Contractor”). The Owner and Contractor hereby agree as follows: <br /> <br />ARTICLE 1 – THE WORK AND THE PROJECT <br />1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work <br />is generally described as follows: Installation of cured in place pipe in sanitary sewer and storm <br />sewer segments shown within the 2021 CIPP Project Packet in Areas A, B, C and D. <br />1.02 The Project, of which the Work under the Contract Documents is a part is generally described as <br />follows: 2021 CIPP Project, City Project No. PW-21-0101. <br /> <br />ARTICLE 2 – CONTRACT DOCUMENTS <br />2.01 The Contract Documents consist of the following: <br />A. This Agreement <br />B. Insurance Certificates <br />C. Instructions to Bidders <br />D. General Conditions <br />E. Supplementary Conditions <br />F. Division 1 – General Requirements <br />G. Division 2 - CEAM Spec 2018 Edition <br />H. Drawings (not attached but incorporated by reference) consisting of 24 sheets with each <br />sheet bearing the following general title: 2021 CIPP Lining Project Maps, dated September <br />2021. <br />I. The following which may be delivered or issued on or after the Effective Date of the <br />Contract and are not attached hereto: <br />1. Notice to Proceed <br />2. Work Change Directives <br />3. Change Orders <br />4. Field Orders <br />2.02 This instrument, together with the documents hereinabove mentioned, form the Agreement, and <br />they are as fully a part of the Agreement as if hereto attached or herein repeated. <br />2.03 The Contract Documents may only be amended, modified, or supplemented as provided in the <br />General Conditions and Supplemental Conditions. <br /> <br />ARTICLE 3 – CONTRACT TIMES <br />1.01 Contract Times: The Work will be substantially completed on or before December 31, 2022, and <br />completed and ready for final payment in accordance with Paragraph 15.06 of the General <br />Conditions on or before May 29, 2023. Substantial Completion Date shall be defined as the <br />completion of all items with the exception of restoration of vegetated areas. <br />1.02 All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the Contract Documents are of the essence of the Contract. <br />1.03 Liquidated Damages: Contractor and Owner recognize that time is of the essence as stated above <br />and that Owner will suffer financial and other losses if the Work is not completed and Milestones <br />not achieved within the times specified in Paragraph 3.01 above, plus any extensions thereof <br />allowed in accordance with the Contract. The parties also recognize that delays, expense, and
The URL can be used to link to this page
Your browser does not support the video tag.