<br /> <br />2021 CIPP PROJECT AGREEMENT <br />PW-21-0101 1 of 5 <br />AGREEMENT BETWEEN OWNER AND CONTRACTOR <br />FOR CONSTRUCTION CONTRACT <br /> <br /> <br />THIS AGREEMENT is made this 8th day of November, 2021 (hereinafter “Effective Date of the Contract”) <br />by and between the City of Arden Hills, Ramsey County, Minnesota (hereinafter “Owner”) and Inaituform <br />(hereinafter “Contractor”). The Owner and Contractor hereby agree as follows: <br /> <br />ARTICLE 1 – THE WORK AND THE PROJECT <br />1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work <br />is generally described as follows: Installation of cured in place pipe in sanitary sewer and storm <br />sewer segments shown within the 2021 CIPP Project Packet in Areas A, B, C and D. <br />1.02 The Project, of which the Work under the Contract Documents is a part is generally described as <br />follows: 2021 CIPP Project, City Project No. PW-21-0101. <br /> <br />ARTICLE 2 – CONTRACT DOCUMENTS <br />2.01 The Contract Documents consist of the following: <br />A. This Agreement <br />B. Insurance Certificates <br />C. Instructions to Bidders <br />D. General Conditions <br />E. Supplementary Conditions <br />F. Division 1 – General Requirements <br />G. Division 2 - CEAM Spec 2018 Edition <br />H. Drawings (not attached but incorporated by reference) consisting of 24 sheets with each <br />sheet bearing the following general title: 2021 CIPP Lining Project Maps, dated September <br />2021. <br />I. The following which may be delivered or issued on or after the Effective Date of the <br />Contract and are not attached hereto: <br />1. Notice to Proceed <br />2. Work Change Directives <br />3. Change Orders <br />4. Field Orders <br />2.02 This instrument, together with the documents hereinabove mentioned, form the Agreement, and <br />they are as fully a part of the Agreement as if hereto attached or herein repeated. <br />2.03 The Contract Documents may only be amended, modified, or supplemented as provided in the <br />General Conditions and Supplemental Conditions. <br /> <br />ARTICLE 3 – CONTRACT TIMES <br />1.01 Contract Times: The Work will be substantially completed on or before December 31, 2022, and <br />completed and ready for final payment in accordance with Paragraph 15.06 of the General <br />Conditions on or before May 29, 2023. Substantial Completion Date shall be defined as the <br />completion of all items with the exception of restoration of vegetated areas. <br />1.02 All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the Contract Documents are of the essence of the Contract. <br />1.03 Liquidated Damages: Contractor and Owner recognize that time is of the essence as stated above <br />and that Owner will suffer financial and other losses if the Work is not completed and Milestones <br />not achieved within the times specified in Paragraph 3.01 above, plus any extensions thereof <br />allowed in accordance with the Contract. The parties also recognize that delays, expense, and