My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-08-21-SR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
11-08-21-SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 12:24:08 PM
Creation date
11/5/2021 12:23:36 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2021 CIPP PROJECT AGREEMENT <br />PW-21-0101 2 of 5 <br />difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner <br />if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and <br />Contractor agree that as liquidated damages for delay, but not as a penalty; <br />A. Substantial Completion: Contractor shall pay Owner $200.00 for each day that expires after <br />the time specified in Paragraph 3.01 above for Substantial Completion until the Work is <br />substantially complete, as duly adjusted pursuant to the Contract. <br />B. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, <br />refuse, or fail to complete the remaining Work within the Contract Time for completion and <br />readiness for final payment, as duly adjusted pursuant to the Contract, Contractor shall pay <br />Owner $300.00 for each day that expires after such time until the Work is completed and ready <br />for final payment. <br />C. Liquidated damages for failing to timely attain Substantial Completion and final completion are <br />not additive and will not be imposed concurrently. <br /> <br />ARTICLE 4 – CONTRACT PRICES <br />4.01 The Owner shall pay the Contractor for the performance of this Agreement according to the <br />schedule of approximate quantities and unit prices as set out in the Contract Documents submitted <br />by the Contractor on October 18, 2021, the aggregate of which is estimated to be $190,249.70. <br />4.02 The Contract shall include Schedule A items as provided on the Proposal Form. <br />4.03 Payment is based an amount equal to the sum of the extended prices, established for each <br />separately identified item of Unit Price Work by multiplying the unit price times the actual quantity <br />of that item completed and accepted by the Engineer. <br />4.04 The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based <br />on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated <br />quantities are not guaranteed, and determination of actual quantities and classifications are to be <br />made by the Engineer. <br /> <br />ARTICLE 5 – PAYMENT PROCEDURES <br />5.01 Progress Payments: Owner shall make progress payments on account of the Contract Price on <br />the basis of Contractor’s Applications for Payment on or about the 10th day of each month during <br />performance of the Work as provided in Paragraph 5.02 below, provided that such Applications for <br />Payment have been submitted in a timely manner and otherwise meet the requirements of the <br />Contract. All such payments will be measured by the Schedule of Values established as provided <br />in the General Conditions (and in the case of Unit Price Work based on the number of units <br />completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract. <br />5.02 Retainage: Prior to Substantial Completion, progress payments will be made in an amount equal <br />to the percentage indicated below but, in each case, less the aggregate of payments previously <br />made and less such amounts as Owner may withhold, including but not limited to liquidated <br />damages, in accordance with the Contract. <br />A. Ninety five (95) percent of Work completed (with the balance being retainage). If the Work has <br />been 50 percent completed as determined by Engineer, and if the character and progress of <br />the Work has been satisfactory to Owner and Engineer, then as long as the character and <br />progress of the Work remain satisfactory to Owner and Engineer, there will be no additional <br />retainage; and <br />B. Fifty (50) percent of cost of materials and equipment not incorporated in the Work (with the <br />balance being retainage). <br />5.03 Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to <br />Contractor to 100 percent of the Work completed, less such amounts set-off by Owner pursuant to <br />Paragraph 15.01E of the General Conditions, and less 200 percent of Engineer’s estimate of the <br />value of Work to be completed or corrected as shown on the punch list of items to be completed or <br />corrected prior to final payment.
The URL can be used to link to this page
Your browser does not support the video tag.