My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-08-21-SR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
11-08-21-SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 12:24:08 PM
Creation date
11/5/2021 12:23:36 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2021 CIPP PROJECT AGREEMENT <br />PW-21-0101 3 of 5 <br />5.04 Final Payment: Upon final completion and acceptance of the Work in accordance with Paragraph <br />15.06 of the General Conditions, Owner shall pay the remainder of the Contract Prices as <br />recommended by Engineer as provided in said Paragraph 15.06. <br /> <br />ARTICLE 6 – CONTRACTOR’S REPRESENTATIONS <br />6.01 In order to induce the Owner to enter into this Contract, Contractor makes the following <br />representations: <br />A. Contractor has examined and carefully studied the Contract Documents, and any data and <br />reference identified in the Contract Documents. <br />B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site and <br />adjacent areas, and become familiar with and is satisfied as to the general, local, and Site <br />conditions that may affect cost, progress, and performance of the Work. <br />C. Contractor is familiar with and is satisfied as to all laws and regulations that may affect cost, <br />progress, and performance of the Work. <br />D. Contractor has carefully studied all reports of explorations and tests of subsurface conditions <br />at or adjacent to the Site and all drawings of physical conditions relating to existing surface or <br />subsurface structures at the Site that have been identified in the Contract Documents, and <br />reports relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that <br />have been identified in the Contract Documents. <br />E. Contractor has considered the information known to Contractor itself; information commonly <br />known to contractors doing business in the locality of the Site; information and observations <br />obtained from visits to the Site; the Contract Documents; and the site-related reports identified <br />in the Contract Documents, with respect to the effect of such information, observation, and <br />documents on (1) the cost, progress and performance of the Work; (2) the means, methods, <br />techniques, sequences, and procedures of construction to be employed by the Contractor; and <br />(3) Contractor’s safety precautions and programs. <br />F. Based on the information and observations referred to in the preceding paragraph, Contractor <br />agrees that no further examinations, investigations, explorations, tests, studies, or data are <br />necessary for the performance of the Work at the Contract Price, within the Contract Times, <br />and in accordance with the other terms and conditions of the Contract. <br />G. Contractor is aware of the general nature of work to be performed by Owner and others at the <br />Site that relates to the Work as indicated in the Contract Documents. <br />H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or <br />discrepancies that Contractor has discovered in the Contract Documents, and the written <br />resolution thereof by Engineer is acceptable to Contractor. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all <br />terms and conditions for performance and furnishing of the Work. <br />J. Contractor’s entry into this Contract constitutes an incontrovertible representation by <br />Contractor that without exception all prices in the Agreement are premised upon performing <br />and furnishing the Work required by the Contract Documents. <br /> <br />ARTICLE 7 – MISCELLANEOUS <br />7.01 Terms: Terms used in the Agreement will have the meanings stated in the General Conditions and <br />Supplementary Conditions. <br />7.02 Assignment of Contract: Unless expressly agreed to elsewhere in the Contract, no assignment by <br />a party hereto of any rights under or interests in the Contract will be binding on another party hereto <br />without the written consent of the party sought to be bound; and, specifically but without limitation, <br />money that may become due and money that is due may not be assigned without such consent <br />(except to the extent that the effect of this restriction may be limited by law), and unless specifically
The URL can be used to link to this page
Your browser does not support the video tag.