My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
11-22-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2021 3:55:13 PM
Creation date
11/18/2021 3:50:43 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> David Swearingen <br />November 3, 2021 <br /> <br /> <br /> 3 <br /> <br />C510 – STORMWATER MANAGEMENT PLAN <br />29. For parking light locations, show location of underground storm system. Provide lighting details to ensure <br />no conflicts with lighting pole bases and underground detention pipes <br />30. Identify EOF in plans and detail. <br />31. Wetland D EOF is listed as 882.5. The emergency spillway 890.75. confirm elevations. <br />32. Draining to MnDOT ROW. Has MnDOT reviewed/approved? Confirm. <br /> <br />C600 – UTILITY PLAN <br />33. Several note leaders are not point to what note describes. Correct. <br />34. Need electrical plans and details for any conflicts with the electrical system and the underground storage <br />system. Particularly the pole foundations. <br />35. Pipe crossing note leader is not pointing to a conflict. Correct. <br />36. The easement along the MnDOT ROW is called out as a 30’ easement. With the 15’ dimension shown, <br />the easement does not appear to be 30’. Confirm. <br />37. Detail all utility crossings of the retaining wall for conflicts. <br />38. How are easements and facilities accessed for maintenance after construction? <br /> <br />C601 – WATERMAIN PROFILE <br />39. Detail 8” existing watermain connection. <br />40. Add notes for watermain bend locations. <br />41. Detail sanitary pipe crossing for conflict. <br />42. Show all wall and foundation details to confirm any conflicts. <br />43. What is 2.79’ depth indicating? Clarify. <br /> <br />C601 – WATERMAIN PROFILE <br />44. Show all wall and foundation details to confirm any conflicts. <br />45. No watermain bends are shown on plan view before 24” PVC storm crossing. Confirm locations. <br />46. Add separation distance at 6+10 proposed storm crossing <br /> <br />C703 – CIVIL DETAILS <br />47. Provide site specific Contech system design and details <br />48. Confirm assumed soil bearing is met on site <br />49. Confirm manhole cap design load is adequate for anticipated vehicle use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.