<br /> David Swearingen <br />November 3, 2021 <br /> <br /> <br /> 2 <br />10. Existing Round Lake Road seems to remain intact. Detail silt fence in this area. <br />11. A large structure is not identified along the MnDOT ROW in the SW corner of the existing road at the SW <br />corner of the existing pond/wetland. It appears pipes are going east and west out of the structure. Identify <br />what this structure is and its ownership. <br />12. Disturbance limits need to be added along wetland D, along the silt fencing. <br />13. Confirm no grading is taking place within wetland D in the NE corner. It is unclear. <br /> <br />C300 – EROSION AND SEDIMENT CONTROL PLAN – PHASE 2 <br />14. Apparent drainage structure on the NW corner of the lot and between lighting islands are not identified. <br />15. If road at the NW corner of the lot is used during construction a construction access must be installed. <br />16. Add Note A along the north edge of Wetland D. <br />17. Existing structures within grading areas do not have elevation information. Elevation details need to be <br />added for grading. <br />18. Not all utilities on other sheets appear to be shown. Show all utility structures in grading areas to confirm <br />elevations. <br /> <br />C400 – OVERALL SITE PLAN <br />19. Existing ponding easement is called to be vacated. What will replace it since public storm water will still <br />utilize the underground storm structure? <br />20. Sanitary sewer easement leaders do not point to an easement line. Show all easements and identify <br />type, etc. <br />21. Manhole callouts and manhole locations are missing in the retaining wall area at the SW corner of the lot. <br /> <br />C401 – ENLARGED SITE PLAN <br />22. Show radii or angle points in lot curbing. <br />23. Need lighting and electrical information and details for parking lot lights. <br /> <br />C500 – GRADING PLAN <br />24. Show high point near NW corner exit. <br />25. How are utilities in SW grading and retaining wall areas going to be accessed after construction? <br /> <br />C501 – GRADING PLAN ENLARGED <br />26. Detail pipe crossing to ensure no conflicts. <br />27. How are utilities in SW grading and retaining wall areas going to be accessed after construction? <br />28. Does new 36” RCP connect to existing pipes? IF so, details needed. If not, detail pipe end point.