My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-03-21 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2021
>
11-03-21 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 2:07:58 PM
Creation date
12/9/2021 2:07:50 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – November 3, 2021 3 <br /> <br />5) Prior to the issuance of a land disturbance permit, engineering staff shall approve in <br />writing the final design of parking lot expansion and underground retention system. <br />6) All light poles, including base, shall be a maximum of 25 feet in height and shall be <br />shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br />lenses. Other than wash or architectural lighting, attached security lighting shall be <br />shoebox style, downward directed with flush lenses. If complaints are received the <br />lighting adjacent to residential uses shall utilize house shields as directed by the City. In <br />addition, any lighting under canopies (building entries) shall be recessed and use a flush <br />lens. <br />7) A right of way permit shall be required for work performed within the City right of way. <br />8) A grading as-built and utility as-built plan shall be provided to the City upon completion <br />of grading and utility work. <br />9) All fencing and retaining wall materials shall be complementary to the building materials <br />and shall be approved in writing by the Planning Division prior to issuance of a building <br />permit. Retaining walls greater than four (4) feet in height shall be engineered and <br />detailed calculations shall be submitted to the City. <br />10) A Grading and Erosion permit shall be obtained from the City’s Engineering Department <br />prior to commencing any grading, land disturbance or utility activities. The Developer <br />shall be responsible for obtaining any permits necessary from other agencies, including <br />but not limited to, MPCA, Rice Creek Watershed District, and Ramsey County, MNDOT <br />prior to the start of any site activities. <br />11) The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />12) Prior to the issuance of a land disturbance permit, the Applicant shall submit an amended <br />stormwater facilities operation and maintenance plan for the long-term care of all on-site <br />and off-site stormwater facilities to the City for review and approval. The Applicant will <br />be responsible to carry out these operation and maintenance activities and to submit the <br />appropriate documentation to the City as specified. <br />13) An amended Stormwater Facilities Operation and Maintenance Agreement shall be <br />presented to the City Engineer for review by the City Attorney and subject to City <br />Council approval. The Stormwater Facilities Operation and Maintenance Agreement shall <br />be fully executed prior to release of a land disturbance permit and building permit. <br />14) Prior to the issuance of a land disturbance permit, all items identified in the Engineering <br />Division memo shall be addressed. All comments shall be adopted herein by reference. <br />15) Prior to issuance of land disturbance permit, the Applicant shall be required to fully <br />execute the vacation and/or dedication of easement(s) as determined by the Public Works <br />Director/City Engineer prior to commencement of any site activities associated with the <br />expanded “proof of parking” area. <br />16) The Applicant shall be required to submit revised site plans prepared in accordance with <br />city code to the Zoning Department for approval prior to issuance of the building and/or <br />land disturbance permits. Site Plan Review does not include approval of setback <br />flexibility as shown. <br /> <br />City Planner Jagoe reviewed the options available to the Planning Commission on this matter:
The URL can be used to link to this page
Your browser does not support the video tag.