My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-13-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
12-13-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 11:51:22 AM
Creation date
12/13/2021 11:48:57 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project:Arden Hills, MN - Hamline Ave <br />Job Number:SAP 062-650-014, PW-20-0103 <br />133,421.65$ <br />10,091.00$ <br />Cost of quantities under the contract amount (526.50)$ <br />142,986.15$ <br />Change Order <br />Number Description Amount Billed Paid Notes <br />1 Sawcutting Structure 95.00$ PA1 Yes <br /> Existing Sanitary utility was right below grade for <br />bottom of structrure. Strucure was cut shorter so <br />it would not be sitting directly on top of the <br />sanitary utility. 1 Guy, 1 Hour, $95.00 per hour. <br />1HR X $95=$95 <br />1 Dog House Extra Hole in <br />Structure 95.00$ PA1 Yes <br />Structure Shop Drawings was approved by <br />engineer with two hole openings in it. Only one <br />hole was needed so the other was Mudded/dog- <br />housed shut. 1 guy, 1 Hour, $95.00 per hour. 1 HR <br />X $95=$95. <br />1 Additional Ped Ramps 6,210.00$ PA2 <br />Additional Ped Ramps were requested by Ramsey <br />County to be installed on Hamline Ave down by <br />the Floral park trail crossing to make them ADA <br />compliant. $6,210.00 for Removal of existing ped <br />ramps and replacing with new. <br />1 12" button Extenders 720.00$ PA2 <br />Button Extenders for the pedestrian flasher <br />system were requested by Ramsey County so that <br />the push bottons would stick out far enough onto <br />the new ped ramp and be ADA Compliant. <br />Material Cost=$402.00 Labor Costs=$318.00 <br />($95X3.35HRS=$318.25) <br />1 Klean Break Systems 1,100.00$ PA2 <br />New Plan set was givin out after bidding. Addition <br />of the added Sign Type C and Object Markers in <br />the median at the request of Ramsey County, <br />breakaway bases were needed as well. ASTC <br />(Traffic Sub) Requested $1,100.00 for Materials <br />and Labor to install these. <br />1 Object Marker Type X4-2 640.00$ PA2 <br />Object Marker increased quantity was at the <br />request of the County and were the basis for the <br />plan amendment #2 that was sent to Pember <br />Contractors. <br />1 Sign Type C 1,200.00$ PA2 <br />Sign Type C increased quantity was at the request <br />of the County and were the basis for the plan <br />amendment #2 that was sent to Pember <br />Contractors. <br />1 Pavement Marking Removal 221.00$ PA2 <br />Pavement Marking Removal quantity was over the <br />contract quantity because the nine existing <br />crosswalk blocks were 8’x3’ instead of the <br />anticipated 6’x3’ for a non-trail crossing. <br />Silt Fence Type HI (28.00)$ <br />Silt Fence Type TB (52.50)$ <br />Fertilzer Type 4 (10.00)$ <br />Seed Mixture 33-261 (10.00)$ <br />Aggregate Base Class 5 (426.00)$ <br />Items not used or partially used during <br />construction <br />Bid items under contract amoung <br />Original Contract Amount <br />Net Change by Change Orders <br />Current Contract Price <br />CHANGE ORDER SUMMARY
The URL can be used to link to this page
Your browser does not support the video tag.