Laserfiche WebLink
Page 2 of 2 <br /> <br />segment along Lake Valentine Road near Valentine Park and the City has 95% design plans for a <br />trail segment on the West side of Old Highway 10 from Lake Valentine Road to County Road <br />E2. Towards the middle of the trail corridor, there is another connection on the south side of <br />Parkshore Drive as part of the senior living development. At the north end of this corridor the <br />trail would meet the existing trail that extends along Old Hwy 10 at the interchange of CR-96. <br /> <br />The feasibility study will provide information of what is involved if this trail were to be designed <br />and constructed, such as, existing conditions with utilities (Public and Private), drainage, <br />environmental challenges, estimated costs and project funding sources. It would also include <br />some Public involvement to identify needs or issues from their feedback. The feasibility report <br />does not commit the City to construct the trail but puts the City in position to pursue funding <br />opportunities when available. <br /> <br />Budget Impact <br />$50,000 was included in the 2022 Budget to cover engineering costs on this project. <br /> <br />Attachments <br /> <br />Attachment A – Proposed trail corridor <br />Attachment B – HR Green Proposal <br />Attachment C – Fee breakdown <br /> <br /> <br /> <br /> <br />