My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-22-SR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
03-21-22-SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 3:50:33 PM
Creation date
3/17/2022 3:49:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> 2 <br />contractors use this item to bury incidental items or find efficiencies with mean and methods that can save them <br />money and effort. Bituminous material costs are always changing and with the recent rise in oil, the engineer’s <br />estimate had been more conservative than typical to try and anticipate rising costs of bituminous. <br />The Concrete Sill bid item may carry a small amount of risk as it is relatively new bid item and some contractors <br />or sub contractors may not be familiar with the specifications and expectations associated with the bid item. The <br />intent is to create a sill for sidewalk adjacent to curb and gutter to rest on to eliminate the sidewalk from settling <br />below the curb over time. <br /> <br />The Remove Light Foundation, Lighting Unit Type LP1, Lighting Unit Type LP2, and Light Foundation Design E <br />Modified were the items with higher costs in the engineer’s estimate than Bituminous Roadway’s bid. Over the <br />past 24 months, we have seen the cost of electrical related raw materials rise exponentially and despite <br />estimating with that inflation in mind, the lighting items still came in above estimate. <br /> <br />Upon further examination of the apparent low bid, the bid provided by Bituminous Roadways was found to be <br />responsive and not materially unbalanced. <br /> <br />Staff recommends Council accept the bids, awarding the contract to Bituminous Roadways for the 2022 Arden Hill <br />City Hall Parking Lot Final Design projects, City Project PW-20-0103. <br /> <br />HR GREEN, INC <br /> <br /> <br /> <br />Jordan Horejsi, PE <br />Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.