My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-22-SR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
03-21-22-SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 3:50:33 PM
Creation date
3/17/2022 3:49:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> 2550 University Avenue West | Suite 400N | St. Paul, MN 55114 <br /> Main 651.644.4389 + Fax 651.644.9446 <br /> HRGREEN.COM <br /> <br /> <br />March 10, 2022 <br />Mr. David Swearingen <br />Public Works Director/City Engineer <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />SUBJECT: Arden Hills City Hall Parking Lot Final Design Project | PW-20-0103 <br /> <br />Dear Mr. Swearingen, <br />On February 14th, 2022 the City Council received plans and specifications for the City Hall Parking Lot Final <br />Design project, City project PW-20-0103 and authorized advertisement for bids. <br />On March 9th, 2022 the City of Arden Hills received bids for the City Hall Parking Lot Final Design project. The <br />results were verified by City-consultant, HR Green. Eight (8) bids were received and ranged between <br />$233,650.00 and $311,242.00. The following is a bid summary: <br /> <br />G Urban Companies $245,076.60 <br />Minnesota Roadways Company $311,242.00* <br />Bituminous Roadways, Inc. $233,650.00 <br />Goodmason Construction. $241,071.70* <br />Pember Construction $257,067.20 <br />North Valley $248,497.13 <br />Omann Contracting Companies $250,492.79 <br />TA Schifsky $244,000.56* <br /> * Adjusted bid total based on corrected math <br /> <br />All but one of the bids were lower than the engineer’s estimate of $271,431.63. The low bid price was 13.9% <br />lower than the engineer’s estimate. <br /> <br />After a thorough review of the bids received, we feel that the engineer’s estimate, along with the low bid, was <br />comparatively accurate, aside from a few bid items. Given the nature of raw materials and labor expenses over <br />the past two years, it was difficult to estimate the construction costs. <br /> <br />The engineer’s estimate was based on previous projects and historical data. Excavation – Common, Bituminous <br />Wearing Course, and Concrete Sill bid items make up the majority of the difference between the engineer’s <br />estimate and Bituminous Roadway’s bid. <br /> <br />Excavation and bituminous material bid items are notoriously difficult to estimate. Excavation cost estimate <br />fluctuate from contractor to contractor because the quantity is generally larger than other quantities and
The URL can be used to link to this page
Your browser does not support the video tag.