My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
03-21-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:00:44 PM
Creation date
3/17/2022 3:59:14 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 7 <br /> <br />Below is a table that illustrates a couple of scenarios for the number of off-street parking spaces <br />required based on these provisions compared to the existing number of spaces: <br /> <br />Off-Street Parking Use <br />Classifications <br />Required <br />Number of <br />Stalls <br />Parking Deficiency <br />10% office/90% warehouse 148 -39 stalls <br />20% office/80% warehouse 182 -74 stalls <br />30% office/70% warehouse 216 -108 stalls <br />Multiple Occupancy Structure – <br />1:1 for each separate use <br />214 -113 stalls <br /> <br />Parking Study <br />During the month of March, the Applicant conducted a study of the parking usage at their Texas <br />location. This location has 126 office and warehouse suites with a maximum tenant occupancy <br />of 186 members. Saltbox has indicated that occupancy is monitored through the issuances of <br />access passes. No further detail was provided on how the number of access passes is determined <br />or how they are distributed amongst the business owners. Additionally, there are 12 Saltbox <br />employees at this location that are not factored into those occupancy numbers. Their Texas site <br />has a total of 85 parking spaces. Saltbox has provided a chart to show peak parking usage over a <br />seven (7) day work week (Attachment E). The Applicant states that “at the peak parking periods <br />only 22% of the parking spaces were utilized by small business tenants”. <br /> <br />In comparison, the proposal for the Arden Hills location would be for 214 office and warehouse <br />suites with an estimated maximum occupancy of 398 members and 15 Saltbox employees. They <br />anticipate a peak parking demand of 91 spaces (i.e. 22% utilization) and feel this site would be <br />sufficient to meet their needs given there are 108 existing parking spaces. <br /> <br />Land Use Application Considerations <br />Planning Staff has advised the Applicant that the warehouse suites as proposed would not be <br />classified under traditional “warehouse” use in calculating the off-street parking requirements <br />given that each of these suites is an individual business. The proposed land use complies with <br />the office and warehouse uses as allowed in the GB District, but it is that ratio of what <br />percentage of each use is occurring within the building. The warehouse suites are set up with a <br />type of desk/workspace for the business owner. There is a high probability that a small business <br />leasing a warehouse suite is performing business operations that fall under activity also related to <br />“office” given the approach of the Saltbox concept. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.