Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – May 4, 2022 6 <br /> <br />Commissioner Zimmerman commented this situation would require flexibility on an ongoing <br />basis. He supported the homeowners association come forward and asking to change the <br />requirements for lot sizes and setbacks for the overall development in order to eliminate the need <br />for future variances within Hunter’s Park. <br /> <br />Chair Vijums stated he understood this concern but reported this neighborhood would still <br />require variances because the lots would never comply with City requirements. He believed it <br />would be very difficult to establish any type of rules at this point for the Hunters Park <br />development. <br /> <br />Commissioner Wicklund moved and Commissioner Blilie seconded a motion to recommend <br />approval of Planning Case 22-004 for a Variance at 1152 Benton Way based on the <br />findings of fact and the submitted plans, as amended by the two (2) conditions in the May <br />4, 2022, report to the Planning Commission. The motion carried unanimously (6-0). <br /> <br />B. Planning Case 22-007; 4440 Round Lake Road West – Site Plan Review – Public <br />Hearing Not Required <br /> <br />City Planner Jagoe stated at their March 21, 2022 meeting the City Council reviewed a concept <br />plan for a company called Saltbox. Saltbox offers flexible warehouse and office suites that are <br />leased by individual businesses, usually startup/small digital commerce companies. The intent of <br />Saltbox is to provide an all-inclusive collaborative workspace to small businesses by providing <br />the essential operations and logistical infrastructure that enables a business to start and scale its <br />growth. <br /> <br />City Planner Jagoe reported Saltbox will be remodeling the interior of the building to construct <br />flexible work spaces that can be used as either warehouse, office, or some combination of the <br />two. Suites will range in size from 76 sq. ft. up to approx. 2,000 sq. ft. The suites are constructed <br />with 10’ high modular walls that are open above with no ceilings. Each suite is equipped with <br />power, HVAC, and Wi-Fi as well as access to a shared central loading dock for shipping/delivery <br />needs. Each Saltbox facility is designed with conference rooms, huddle rooms/lounges, <br />bathrooms, main entry/welcoming area, and a break room that are shared by the small business <br />tenants. The facility is open seven (7) days a week from 6 AM to 11 PM. <br /> <br />City Planner Jagoe explained Saltbox employs Operations Specialists that handle the on- <br />demand logistical services for receipt and delivery of packages, plus they are able to provide <br />order fulfillment assistance to the small business owners. A package that is delivered to Saltbox <br />is received by the Operations Specialist at the loading dock. The Saltbox employee then <br />distributes smaller boxes to the individual suites or there is secured warehouse space for larger <br />packages. Saltbox employees are onsite from 8 AM to 6 PM. The Applicant has stated this <br />window of time is when 95% of their activity is expected to occur. <br /> <br />City Planner Jagoe indicated the Arden Hills location would be for 214 warehouse and office <br />suites with an estimated maximum occupancy of 398 members and 15 Saltbox employees. <br />Saltbox would say that their flexible business model means that the 398 members would not be <br />at the facility at the same time, but rather come and go at the needs of their individual business. <br />As part of the improvements to the property, the Applicant is proposing to reconfigure the <br />parking lot layout that would result in the immediate addition of 36 parking spaces and also